Manor Farm, Southwick Road, Mark, Highbridge, Somerset, TA9 4LH Data via plota.co.uk

33/26/00008 - Notice of Proposed Agricultural Devt. Approved

Proposal

Application to determine if prior approval is required for the proposed.... Erection of an 24.38m x 18.29m agricultural hay barn. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jun 2026
✓
Approved
16 Jun 2026

Approved on 16 Jun 2026 · Last checked 10 Sept 2026

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 41 m away: Hinkley Point C Connection
The site is about 41 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 32 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Somerset Coast, Levels and Moors; Priority habitat about 14 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Notice of Proposed Agricultural Devt.
Postcode
TA9 4LH
Received
2 Jun 2026
Validated
2 Jun 2026
Parish
Mark
Case officer
Show
Decision
Formal Application Not Required
Decision date
16 Jun 2026
Applicant
Show
Agent
Greenslade Taylor Hunt (Burnham)

How this decision compares

Decided in 14 days from validation, 13 days faster than Sedgemoor's median of 27 for agricultural works. Approved, as 87% of agricultural works here are.

80%decided within 8 weeks
87%approved
85decided in the last year

Plota live figures for agricultural works decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
10 Jun 2026
Comments by
14 Jun 2026