Alverton House Alverton Road Penzance Cornwall TR18 4TF Data via plota.co.uk

PA26/04217 - Tree Preservation Order Approved

Proposal

Works to Trees covered by a Tree Preservation Order (TPO) - T1 - Dead Elm, G1 - Cypress, T2 - Bay, G2 - Sycamore, T3 - Sycamore, T4 - Bay, T5 - Bay, T6 - Sycamore and T7 - Dead Elm - Fell all to ground level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Jun 2026
✓
Approved
17 Jul 2026

Approved on 17 Jul 2026 · Self Sign Off (Area Team) · Last checked 20 Jul 2026

Site constraints 4

Grade II listed: Alverton House
List entry 1143141 · 25 m away · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Penzance built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cornwall - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cornwall
Application type
Tree Preservation Order
Postcode
TR18 4TF
Received
18 Jun 2026
Validated
18 Jun 2026
Ward
Penzance Promenade
Parish
Penzance
Case officer
Show
Target decision
13 Aug 2026
Decision
Approved with conditions
Decision date
17 Jul 2026
Decision level
Self Sign Off (Area Team)
Applicant
Show
Agent
Charlie Jose Tree Surgery

How this decision compares

Decided in 29 days from validation, 8 days faster than Cornwall's median of 37 for tree and landscaping works. Approved, as 88% of tree and landscaping works here are.

95%decided within 8 weeks
88%approved
868decided in the last year

Plota live figures for tree and landscaping works decided by Cornwall in the last twelve months, from validation. Cornwall decision record →

Consultation & key dates

Alt. reference
PP-15013072
Planning Portal ref
PP-15013072
Statutory expiry
13 Aug 2026
Env. assessment
No
Cornwall
Planning Authority Score
7.9/10
Good
#28 of 296 councils
Relevant to this application:
Householder decisions

Cornwall is faster than most councils at deciding householder applications, ranking #64 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Cornwall decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #79 of 296
97%
Householder approved
Above avg (90%) #28 of 296
76%
Decided in 8 weeks
Above avg (63%) #64 of 296
35%
Extended time limit
Below avg (41%) #101 of 296
82%
Minor dwellings approved
1180 decided (1-9 homes)
94%
Major dwellings approved
67 decided (10+ homes)
93%
Change of use approved
194 decided
4,839
Total decisions
363 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use