Ladford Farm Shebbear Beaworthy Devon EX21 5QY Data via plota.co.uk

1/0196/2026/AGR - Agricultural Notification Approved

Proposal

Silage storage shed Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Mar 2026
✓
Validated
6 Mar 2026
✓
Approved
2 Apr 2026

Approved on 2 Apr 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Nature improvement area: Northern Devon.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
Agricultural Notification
Postcode
EX21 5QY
Received
5 Mar 2026
Validated
6 Mar 2026
Ward
Shebbear And Langtree
Parish
Shebbear
Case officer
Show
Target decision
3 Apr 2026
Decision
Application Approved
Decision date
2 Apr 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 27 days from validation, 23 days faster than Torridge's median of 50 for agricultural works. Approved, as 91% of agricultural works here are.

73%decided within 8 weeks
91%approved
137decided in the last year

Plota live figures for agricultural works decided by Torridge in the last twelve months, from validation. Torridge decision record →

Consultation & key dates

Alt. reference
PP-14757231
Planning Portal ref
PP-14757231
Statutory expiry
3 Apr 2026
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Householder decisions

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026