Southern Grove Lodge, 60 Southern Grove, London, E3 4PN Data via plota.co.uk

PA/26/01446/A1 - Full Planning Permission Registered

Proposal

Demolition of the existing office building and erection of a six-storey building to provide residential dwellings, together with the conversion of Southern Grove Lodge to residential use (Use Class C3), including associated works comprising the provision of amenity and play space, parking, cycle storage, servicing and landscaping Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Consultation
17 Sept 2026
Decision
Expected by 16 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 72.

The consultation period closed on 28 Sept 2026.

Documents 149

Statements & assessments 35

PDF INCLUDING TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Heritage Statement · 27 Aug 2026 View ↗ PDF EQUALITY IMPACT ASSESSMENT INITIAL SCREENING TOOL Correspondence · 18 Aug 2026 View ↗ PDF INCLUDING AFFORDABLE HOUSING STATEMENT AND DRAFT PLANNING OBLIGATIONS STATEMENT Planning Statement · 17 Aug 2026 View ↗ PDF TREE SURVEY Report · 17 Aug 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Report · 17 Aug 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Report · 17 Aug 2026 View ↗ PDF ARCHAEOLOGICAL DESK-BASED ASSESSMENT Report · 17 Aug 2026 View ↗ PDF PART 8 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 7 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 6 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 5 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 3 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 4 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 1 Design & Access Statement · 17 Aug 2026 View ↗ PDF PART 2 Design & Access Statement · 17 Aug 2026 View ↗ PDF SOUTHERN GROVE BNG METRIC Correspondence · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 4 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 3 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 5 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 2 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 1 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 7 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 9 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 6 Report · 17 Aug 2026 View ↗ PDF PRELIMINARY RISK ASSESSMENT - PART 8 Report · 17 Aug 2026 View ↗ PDF RAPID HEALTH IMPACT ASSESSMENT MATRIX (SELF-COMPLETION FORM) Report · 17 Aug 2026 View ↗ PDF TRANSPORT ASSESSMENT Report · 17 Aug 2026 View ↗ PDF AIR QUALITY AND AIR QUALITY NEUTRAL ASSESSMENT Report · 17 Aug 2026 View ↗ PDF DETAILED RISK ASSESSMENT FOR POTENTIAL UXO CONTAMINATION Report · 17 Aug 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL LETTER DATED: 26 JUNE 2026 Correspondence · 17 Aug 2026 View ↗ PDF DRAINAGE STRATEGY Report · 17 Aug 2026 View ↗ PDF ENERGY ASSESSMENT Report · 17 Aug 2026 View ↗ PDF OVERHEATING ASSESSMENT Report · 17 Aug 2026 View ↗ PDF Flood Risk Assessment Flood Risk Assessment · 17 Aug 2026 View ↗ PDF NOISE IMPACT ASSESSMENT REPORT Report · 17 Aug 2026 View ↗

Plans & drawings 74

PDF CONSTRUCTION MANAGEMENT PLAN Report · 17 Aug 2026 View ↗ PDF MAC TWH HTA SGX XX DR L 0950 PL01 LANDSCAPE SECTIONS Current Plan · 17 Aug 2026 View ↗ PDF MAC TWH HTA SGX RF DR L 0920 PL01 ROOF LANDSCAPE GA Current Plan · 17 Aug 2026 View ↗ PDF MAC TWH HTA SGX 00 DR L 0900 PL01 GROUND FLOOR LANDSCAPE GA Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGX-XX-DR-A-0001 PL01 EXISTING SITE LOCATION PLAN Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGX-XX-DR-A-0002 PL01 EXISTING SITE PLAN Current Plan · 17 Aug 2026 View ↗ PDF Drawing/Document Issue Register Drawing/Document Issue Register · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGX-XX-DR-A-0040 PL01 DEMOLITION PLAN Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGX-RF-DR-A-0120 PL01 PROPOSED SITE PLAN - ROOFPL01149206600000.PDF Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGX-00-DR-A-0110 PL01 PROPOSED SITE PLAN - GROUND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0231 PL01 BLOCK A GA ELEVATIONS SOUTH AND WEST Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0230 PL01 BLOCK A GA ELEVATIONS NORTH AND EAST Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0311 PL01 BLOCK A UNIT PLAN - 2B4P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0310 PL01 BLOCK A UNIT PLAN - 2B3P- WCH-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0320 PL01 BLOCK A UNIT PLAN - 3B5P-M-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0322 PL01 BLOCK A UNIT PLAN - 3B5P-B Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-RF-DR-A-0210 PL01 BLOCK A GA PLAN - ROOF Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0220 PL01 BLOCK A GA SECTIONS Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0331 PL01 BLOCK A UNIT PLAN - 4B8P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0330 PL01 BLOCK A UNIT PLAN - 4B7P-M-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-04-DR-A-0204 PL01 BLOCK A GA PLAN - FOURTH FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0326 PL01 BLOCK A UNIT PLAN - 4B7P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-05-DR-A-0205 PL01 BLOCK A GA PLAN - FIFTH FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-03-DR-A-0203 PL01 BLOCK A GA PLAN - THIRD FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0325 PL01 BLOCK A UNIT PLAN - 3B5P- WCH-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-02-DR-A-0202 PL01 BLOCK A GA PLAN - SECOND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-01-DR-A-0201 PL01 BLOCK A GA PLAN - FIRST FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-00-DR-A-0200 PL01 BLOCK A GA PLAN - GROUND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0601 PL01 BAY STUDY SECTION AA Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0602 PL01 BAY STUDY SECTION BB Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGA-XX-DR-A-0603 PL01 BAY STUDY SECTION CC Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-01-DR-A-0252 PL01 BLOCK B GA PLAN - FIRST FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-02-DR-A-0253 PL01 BLOCK B GA PLAN - SECOND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0367 PL01 BLOCK B UNIT PLAN 2B4P-M-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0352 PL01 BLOCK B UNIT PLAN 1B2P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0365 PL01 BLOCK B UNIT PLAN 2B4P-B Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0351 PL01 BLOCK B UNIT PLAN 1B1P-B Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-01-DR-A-0052 PL01 BLOCK B EXISTING BUILDING PLAN - FIRST FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0366 PL01 BLOCK B UNIT PLAN 2B4P-C Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0363 PL01 BLOCK B UNIT PLAN 2B3P-M-B Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0350 PL01 BLOCK B UNIT PLAN 1B1P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0364 PL01 BLOCK B UNIT PLAN 2B4P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-00-DR-A-0051 PL01 BLOCK B EXISTING BUILDING PLAN - GROUND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0281 PL01 BLOCK B GA ELEVATIONS - SOUTH & WEST Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0362 PL01 BLOCK B UNIT PLAN 2B3P-M-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-00-DR-A-0251 PL01 BLOCK B GA PLAN - GROUND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0361 PL01 BLOCK B UNIT PLAN 2B3P-B Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0360 PL01 BLOCK B UNIT PLAN 2B3P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0270 PL01 BLOCK B GA SECTIONS Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0280 PL01 BLOCK B GA ELEVATIONS - NORTH & EAST Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0358 PL01 BLOCK B UNIT PLAN 1B2P-M-B Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB--1-DR-A-0250 PL01 BLOCK B GA PLAN - BASEMENT PLAN Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0357 PL01 BLOCK B UNIT PLAN 1B2P-M-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0080 PL01 EXISTING BUILDING ELEVATIONS - NORTH & EAST Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-02-DR-A-0053 PL01 BLOCK B EXISTING BUILDING PLAN - SECOND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0353 PL01 BLOCK B UNIT PLAN 1B2P- BPL01 Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0354 PL01 BLOCK B UNIT PLAN 1B2P-C Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-RF-DR-A-0054 PL01 BLOCK B EXISTING BUILDING PLAN - ROOF Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB--1-DR-A-0050 PL01 BLOCK B EXISTING BUILDING PLAN - BASEMENT Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0371 PL01 BLOCK B UNIT PLAN 3B5P-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0355 PL01 BLOCK B UNIT PLAN 1B2P-D Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0356 PL01 BLOCK B UNIT PLAN 1B2P-E Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0372 PL01 BLOCK B UNIT PLAN 3B5P-M-A Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0081 PL01 EXISTING BUILDING ELEVATIONS - SOUTH & WEST Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-RF-DR-A-0260 PL01 BLOCK B GA PLAN - ROOF Current Plan · 17 Aug 2026 View ↗ PDF MAC-TWH-HTA-SGB-XX-DR-A-0370 PL01 BLOCK B UNIT PLAN 3B4P-A Current Plan · 17 Aug 2026 View ↗ PDF SG5 SOUTHERN GROVE FOURTH FLOOR Current Plan · 17 Aug 2026 View ↗ PDF SOUTHERN GROVE SECOND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF SG2 SOUTHERN GROVE FIRST FLOOR Current Plan · 17 Aug 2026 View ↗ PDF SG4 SOUTHERN GROVE THIRD FLOOR Current Plan · 17 Aug 2026 View ↗ PDF SG1 SOUTHERN GROVE GROUND FLOOR Current Plan · 17 Aug 2026 View ↗ PDF 6941 R2 REV 2 EXISTING ELEVATIONS SHEET 1 OF 6 Current Plan · 17 Aug 2026 View ↗ PDF 6941 R2 REV 2 EXISTING ELEVATIONS SHEET 2 OF 6 Current Plan · 17 Aug 2026 View ↗ PDF RESIDENTIAL TRAVEL PLAN Report · 17 Aug 2026 View ↗

Other documents 39

PDF VUCITY MODEL INFORMATION Correspondence · 18 Aug 2026 View ↗ PDF PART 2 Daylight & Sunlight · 17 Aug 2026 View ↗ PDF PART 1 Daylight & Sunlight · 17 Aug 2026 View ↗ PDF FIRE SAFETY STRATEGY Report · 17 Aug 2026 View ↗ PDF CEMP APPENDICES Report · 17 Aug 2026 View ↗ PDF SOUTHERN GROVE SCHEDULE OF ACCOMMODATION Correspondence · 17 Aug 2026 View ↗ PDF SCHEDULE OF ACCOMMODATION Correspondence · 17 Aug 2026 View ↗ PDF OPERATIONAL WASTE MANAGEMENT STRATEGY Report · 17 Aug 2026 View ↗ PDF LANDSCAPE MANAGEMENT SCHEDULE Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 1B2PF (LEVEL 0) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 1B2PF (LEVEL 0) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 1B2PF (LEVEL 3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 1B2PF (LEVEL 5) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 1B2PF (LEVEL 3 )BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 2B3PF WCH (LEVEL 3) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 2B4PF (LEVEL 3) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 1B2PF (LEVEL 5) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 2B3PF WCH (LEVEL 3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 2B4PF (LEVEL 3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF (LEVEL 3) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF (LEVEL 0) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF (LEVEL 0) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF (LEVEL 5) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF (LEVEL 5) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF (LEVEL 3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF WCH (LEVEL 3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PF WCH (LEVEL 3) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PM (LEVELS 0-1) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PM (LEVELS 2-3) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PM (LEVELS 0-1) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PM (LEVELS 2-3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PM (LEVELS 4-5) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 3B5PM (LEVELS 4-5) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 4B7PF (LEVEL 3) BE GREEN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 4B7PF (LEVEL 3) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 4B7PM (LEVELS 4-5) BE LEAN Report · 17 Aug 2026 View ↗ PDF COMBINED REPORT 4B7PM (LEVELS 4-5) BE GREEN F Report · 17 Aug 2026 View ↗ PDF FOUL SEWAGE AND UTILITIES Report · 17 Aug 2026 View ↗ PDF COVER LETTER DATED: 14 AUG 2026 Report · 17 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 9

Tower Hamlets Cemetery conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Heritage at risk: Tower Hamlets Cemetery, Bow
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 106 m away: Tower Hamlets Cemetery Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 430 m away: Thames Tideway Tunnel
The site is 430 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Protected tree 10 m away: Almond (Prunus Dolci), order 0000_17
Named in a tree preservation order: work to it, its roots included, needs the council's consent first.
Root protection areas reach up to 15 m from a large tree, so an extension or new foundations this close usually needs a tree survey. Only some councils publish their single trees, and a position can be approximate: the order at the council is the definitive record, and no tree shown is not proof there is none.
Tree record ↗
Also on the record
10 listed buildings within 150 m; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E3 4PN
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Mile End
Case officer
Show
Target decision
16 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Sphere25

Decision outlook

Day 72, past the statutory target. 77% of new homes in Tower Hamlets are decided within thirteen weeks, which runs to 16 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 7216 days past the 56-day target
61%decided within 8 weeks
58%approved
36decided in the last year

Plota live figures for new homes decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
28 Sept 2026
Site or press notice
10 Sept 2026
Statutory expiry
16 Nov 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026