Langley Drive,Castle Bromwich Business Park ,Birmingham,B35, Data via plota.co.uk

Proposal

Application to determine condition 2 (Materials Details - in part) attached to Schedule 17 approval reference under the High Speed Rail (London - West Midlands) Act 2017, relating to building works associated with the construction of an intermediate shaft headhouse serving the Bromford Tunnel, together with associated lighting, security fencing, bollards and vehicle parking areas. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2026
✓
Approved
19 Aug 2026

Approved on 19 Aug 2026 · Last checked 7 Sept 2026

Associated applications 2

  • Part of

    council archive

    Conditions details submitted for 2

    • ConditionsApplication to determine condition 2 (Materials Details - in part) attached to Schedule 17…This application2026/04494/PA

Site constraints 10

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
City Wide Hmo. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Birmingham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument 95 m away: Bromwich Castle
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Local nature reserve 369 m away: Beechcroft; Nature improvement area: Birmingham and the Black Country; Flood defence 9 m away (wall); Inside the Birmingham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Birmingham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Birmingham
Received
22 Jul 2026
Validated
22 Jul 2026
Ward
Castle Vale
Case officer
Show
Decision
Approve
Decision date
19 Aug 2026
Applicant
Show
Agent
Phillip McIntosh / Balfour Beatty Vinci JV (BBV)

How this decision compares

Decided in 28 days from validation, 93 days faster than Birmingham's median of 121 for commercial and major works. Approved, as 81% of commercial and major works here are.

13%decided within 8 weeks
81%approved
53decided in the last year

Plota live figures for commercial and major works decided by Birmingham in the last twelve months, from validation. Birmingham decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
29 Jul 2026
Comments by
21 Aug 2026
Statutory expiry
16 Sept 2026
Birmingham
Planning Authority Score
2.2/10
Poor
#265 of 296 councils
Relevant to this application:
Householder decisions

Birmingham is slower than most councils at deciding householder applications, ranking #245 out of 296. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Birmingham decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #244 of 296
86%
Householder approved
Below avg (90%) #240 of 296
48%
Decided in 8 weeks
Below avg (63%) #245 of 296
47%
Extended time limit
Above avg (41%) #205 of 296
71%
Minor dwellings approved
98 decided (1-9 homes)
94%
Major dwellings approved
33 decided (10+ homes)
56%
Change of use approved
261 decided
3,472
Total decisions
619 refused in the year to March 2026