Piggotts Farm Ipswich Road Tasburgh Norfolk NR15 1NS Data via plota.co.uk

2026/3111 - Full Pending Consideration

Proposal

Erection of 3 equine field shelters (plus one existing shelter to be moved), new hard pads and 2 x perforated stands, and a new trackway with a turning point. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Oct 2026
✓
Validated
21 Oct 2026
✓
Consultation
22 Oct 2026
Decision
Expected by 16 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 14 Dec 2026 and 7 Jan 2027, from South Norfolk Broadland's recent agricultural works.

Comments are open until 12 Nov 2026

Comment on this application ↗

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 331 m away: East Pye Solar
The site is 331 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 26 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area79 m² (850 sq ft)
Energy ratingE (40 out of 100), could reach A
PropertyDetached bungalow, 5 habitable rooms
Built1983 to 1990
HeatingElectric storage heaters, Room heaters, electric
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in May 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR15 1NS
Received
16 Oct 2026
Validated
21 Oct 2026
Ward
Hempnall
Parish
Tasburgh
Target decision
16 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Isle Architects
Freehold owner
Show

Decision outlook

Day 7 of the 56-day target. South Norfolk Broadland usually decides agricultural works by day 67.

Day 760 days to the predicted decision (day 67)
46%decided within 8 weeks
86%approved
68decided in the last year

Plota live figures for agricultural works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

15 neighbours consulted · Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15293007
Planning Portal ref
PP-15293007
Neighbours
22 Oct 2026
Consultation
22 Oct 2026
Comments by
12 Nov 2026
Statutory expiry
16 Dec 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.