Royal Oak Inn Main Road Hirst Courtney North Yorkshire YO8 8QT Data via plota.co.uk

SELZG2026/0130/REM - Approval of Reserved Matters Registered

Proposal

Reserved matters application including access, layout, scale, appearance and landscaping of approval Outline application with all matters reserved for erection of up to 7 dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Feb 2026
✓
Consultation
9 Mar 2026
Decision
Expected by 9 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 11 Aug 2026; it is now day 240.

The consultation period closed on 11 Aug 2026.

Documents 15

All documents on the council site ↗

Associated applications 2

  • Part of

    OutlineApprovedcouncil archive
    • Reserved mattersReserved matters application including access, layout, scale, appearance and landscaping…This applicationSELZG2026/0130/REM

Site constraints 3

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers and the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 483 m away: Helios Renewable Energy Project
The site is 483 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Thorpe Marsh Gas Pipeline (decided, 1623 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1422 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Approval of Reserved Matters
Postcode
YO8 8QT
Received
11 Feb 2026
Validated
11 Feb 2026
Ward
Camblesforth & Carlton
Parish
Hirst Courtney
Case officer
Show
Target decision
9 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
DPA Planning Ltd

Decision outlook

Day 240, past the statutory target. 74% of new homes in Selby are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 240184 days past the 56-day target
48%decided within 8 weeks
41%approved
33decided in the last year

Plota live figures for new homes decided by Selby in the last twelve months, from validation. Selby decision record →

Public comments

1comment received
1 supporting

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14692927
Planning Portal ref
PP-14692927
Consultation
9 Mar 2026
Comments by
11 Aug 2026
Site or press notice
15 Jul 2026
Statutory expiry
8 Apr 2026
Env. assessment
No