25/01707/MDC - Submission of details (Planning) Approved

Proposal

Submission of enlistment to the Non-Road Mobile Machinery Register; a Demolition and Construction Logistics Plan to manage all freight vehicle movements to and from the site during works related to the development; and a scheme of protective works pursuant to conditions 2, 3 and 4 of planning permission dated 08/03/2024. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Dec 2025
✓
Consultation
14 Jan 2026
✓
Approved
15 May 2026
✗
Appeal dismissed
29 May 2026

Approved on 15 May 2026 · Delegated Decision · Last checked 6 Oct 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2, 3, 4 discharged

    • ConditionsSubmission of enlistment to the Non-Road Mobile Machinery Register; a Demolition…This application25/01707/MDC

Site constraints 11

St Paul's Cathedral conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument about 33 m away: Stationers' Hall
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 11 m away: Thames Tideway Tunnel
The site is about 11 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 271 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
34 listed buildings within 150 m of the postcode pin
Nearest: 34-40, Ludgate Hill Ec4, Grade II, about 27 m from the postcode pin · 8 Grade I, 5 Grade II*, 20 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 34 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Wider setting of protected view 2A.1 Parliament Hill summit to St Paul's Cathedral; 4A.1 Primrose Hill summit to St Paul's Cathedral; 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral; Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 16 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Submission of details (Planning)
Postcode
EC4M 7DR
Received
5 Dec 2025
Validated
5 Dec 2025
Ward
Farringdon Within
Target decision
30 Jan 2026
Decision
Approved
Decision date
15 May 2026
Decision level
Delegated Decision
Appeal
Dismissed · 29 May 2026 · Written Representations · Inspectorate case 6002844 ↗
Applicant
Show
Agent
Health & safety Risk services

How this decision compares

Decided in 161 days from validation, 97 days slower than City of London's median of 64 for discharge of conditions. Approved, as 100% of discharge of conditions here are.

44%decided within 8 weeks
100%approved
585decided in the last year

Plota live figures for discharge of conditions decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

1comment received
1 supporting

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14543065
Planning Portal ref
PP-14543065
Consultation
14 Jan 2026
Comments by
28 Jan 2026
Committee
15 May 2026
Statutory expiry
30 Jan 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Householder decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026