Land Near Birchdale Farm Wood Lane Norton Disney Lincoln Lincolnshire Data via plota.co.uk

26/0311/OHL - Overhead Electricity Lines Decided

Proposal

Install a stub leg pole to existing pole Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Mar 2026
Decision
Expected by 23 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 211.

Site constraints 3

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1638 m away: Fosse Green Energy; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Electricity Lines
Postcode
LN6 9QQ
Received
12 Mar 2026
Validated
12 Mar 2026
Ward
Bassingham Rural
Parish
Norton Disney
Case officer
Show
Target decision
23 Apr 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 211, past the statutory target. 82% of utility and infrastructure works in North Kesteven are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 6 Oct 2026.

Day 211155 days past the 56-day target
67%decided within 8 weeks
100%approved
37decided in the last year

Plota live figures for utility and infrastructure works decided by North Kesteven in the last twelve months, from validation. North Kesteven decision record →

Public comments

No public comments yet.

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
23 Apr 2026
Env. assessment
No
North Kesteven
Planning Authority Score
6.5/10
Good
#79 of 296 councils
Relevant to this application:
Householder decisions

North Kesteven ranks #117 out of 296 councils for householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Kesteven decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #4 of 296
99%
Householder approved
Above avg (90%) #6 of 296
71%
Decided in 8 weeks
Above avg (63%) #117 of 296
45%
Extended time limit
Above avg (41%) #193 of 296
90%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
97%
Change of use approved
36 decided
631
Total decisions
19 refused in the year to March 2026