10 The Pieces SouthWhiston 0010 Data via plota.co.uk

RB2026/1053 Approved

Proposal

Application to undertake works to trees protected by RMBC TPO 1 (1976) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Jul 2026
✓
Validated
30 Jul 2026
✓
Approved
9 Sept 2026

Approved on 9 Sept 2026 · Proposed to be Delegated · Last checked 10 Sept 2026

Site constraints 8

Surface water flood risk
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 124 m away: Whitestone Solar Farm
The site is about 124 m from the project boundary. Generating station, accepted for examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2; Flood defence about 18 m from the postcode pin (natural high ground, designed for a 1 in 25 year flood); Coalfield, development low risk area; Inside the Whiston built-up area; Conservation area about 95 m away: Whiston.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Postcode
S60 4HG
Received
29 Jul 2026
Validated
30 Jul 2026
Ward
Sitwell Ward
Parish
Whiston
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
9 Sept 2026
Decision level
Proposed to be Delegated
Applicant
Show

How this decision compares

Decided in 41 days from validation, about the council's usual 42 days. Approved, as 94% of tree and landscaping works here are.

83%decided within 8 weeks
94%approved
66decided in the last year

Plota live figures for tree and landscaping works decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Consultation & key dates

Consultation
29 Jul 2026
Comments by
31 Aug 2026
Statutory expiry
24 Sept 2026
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 councils
Relevant to this application:
Householder decisions

Rotherham ranks #107 out of 296 councils for householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026