PA/26/01737/NC - Outline Planning Permission Registered

Proposal

A hybrid planning application for: Detailed planning application for works to including: The erection of a deck structure, linked staircase and pedestrian and cyclist lift at Mackenzie Walk, the erection of a new pedestrian and cyclist lift adjacent to the Newfoundland Place Tower fronting Westferry Road. Partial demolition (levels 1 and 2) and associated external alterations to the existing Newfoundland Annex Building, minor alterations to the Newfoundland Place Tower, and associated works. Outline planning application (landscaping, appearance, layout matters reserved) for: Details of appearance in relation to the public realm, landscaping and details relating to the hard/soft landscaping works on and around the deck and the layout of pedestrian access routes, circulation areas and associated surface arrangements; and other works associated with the development. [For consultation only: Application 0] Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 12 Oct 2026
Decision
Expected by 1 Feb 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 14 Dec 2026 and 11 Jan 2027, from Tower Hamlets's recent commercial and major works.

Documents 104

Statements & assessments 74

PDF PART 1 Design & Access Statement · 23 Oct 2026 View ↗ PDF VOL1 CH03 ALTERNATIVES AND DESIGN EVOLUTION Environmental Statement · 16 Oct 2026 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 5 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 2 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 1 Report · 12 Oct 2026 View ↗ PDF URBAN GREENING STATEMENT Report · 12 Oct 2026 View ↗ PDF GROUND CONTAMINATION PRELIMINARY RISK ASSESSMENT - PART 5 Report · 12 Oct 2026 View ↗ PDF GROUND CONTAMINATION PRELIMINARY RISK ASSESSMENT - PART 3 Report · 12 Oct 2026 View ↗ PDF 2609132-TMA-XX-DR-AP-2100 P00 BS 5837 TREE SURVEY PLAN Current Plan · 12 Oct 2026 View ↗ PDF GROUND CONTAMINATION PRELIMINARY RISK ASSESSMENT - PART 4 Report · 12 Oct 2026 View ↗ PDF AND DRAINAGE STRATEGY - PART 2 Flood Risk Assessment · 12 Oct 2026 View ↗ PDF GROUND CONTAMINATION PRELIMINARY RISK ASSESSMENT - PART 2 Report · 12 Oct 2026 View ↗ PDF AND DRAINAGE STRATEGY - PART 1 Flood Risk Assessment · 12 Oct 2026 View ↗ PDF ECOLOGICAL APPRAISAL Report · 12 Oct 2026 View ↗ PDF PART 6 Design & Access Statement · 12 Oct 2026 View ↗ PDF PART 5 Design & Access Statement · 12 Oct 2026 View ↗ PDF PART 4 Design & Access Statement · 12 Oct 2026 View ↗ PDF PART 3 Design & Access Statement · 12 Oct 2026 View ↗ PDF PART 2 Design & Access Statement · 12 Oct 2026 View ↗ PDF ARCHAEOLOGICAL DESK BASED ASSESSMENT Report · 12 Oct 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT - PART 2 Report · 12 Oct 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT - PART 3 Report · 12 Oct 2026 View ↗ PDF TRANSPORT ASSESSMENT (INCLUDING CLP) - PART 2 Report · 12 Oct 2026 View ↗ PDF TRANSPORT ASSESSMENT (INCLUDING CLP) - PART 4 Report · 12 Oct 2026 View ↗ PDF TRANSPORT ASSESSMENT (INCLUDING CLP) - PART 3 Report · 12 Oct 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT - PART 1 Report · 12 Oct 2026 View ↗ PDF TRANSPORT ASSESSMENT (INCLUDING CLP) - PART 1 Report · 12 Oct 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT - PART 5 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 10 Report · 12 Oct 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 9 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 8 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 7 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 6 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 4 Report · 12 Oct 2026 View ↗ PDF UTILITIES STATEMENT - PART 3 Report · 12 Oct 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 1 Report · 12 Oct 2026 View ↗ PDF WHOLE LIFE CARBON ASSESSMENT Report · 12 Oct 2026 View ↗ PDF FIRE STATEMENT Report · 12 Oct 2026 View ↗ PDF GLA WLC ASSESSMENT TEMPLATE Correspondence · 12 Oct 2026 View ↗ PDF BIODIVERSITY NET GAIN ASSESSMENT Report · 12 Oct 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 2 Report · 12 Oct 2026 View ↗ PDF NON- TECHNICAL SUMMARY Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH02 EIA METHODOLOGY Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH01 INTRODUCTION Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH05 ENABLING WORKS DEMOLITION CONSTRUCTION Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH06 SOCIO-ECONOMICS Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH04 PROPOSED DEVELOPMENT Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH08 AIR QUALITY Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH10 DSO Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH07 TRAFFIC AND MOVEMENT Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH09 NOISE AND VIBRATION Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH12 CLIMATE CHANGE Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH11 WINDMICROCLIMATE Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH14 LIKELY SIGNIFICANT EFFECTS AND CONCLUSIONS Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH13 EFFECT INTERACTIONS Environmental Statement · 12 Oct 2026 View ↗ PDF VOL1 CH15 MITIGATION MONITORING Environmental Statement · 12 Oct 2026 View ↗ PDF VOL2 HTVIA - PART 3 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL2 HTVIA - PART 1 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL2 HTVIA - PART 2 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX AIR QUALITY Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX DSOSGL - PART 3 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX INTRODUCTION Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX EIA METHODOLOGY - PART 1 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX DSOSGL - PART 1 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX EIA METHODOLOGY - PART 2 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX DSOSGL - PART 2 Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX SOCIO ECONOMICS Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX TRANSPORT Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENDIX WIND MICROCLIMATE Environmental Statement · 12 Oct 2026 View ↗ PDF VOL3 APPENIDX NOISE Environmental Statement · 12 Oct 2026 View ↗ PDF (INCLUDING HIA) Planning Statement · 12 Oct 2026 View ↗ PDF GROUND CONTAMINATION PRELIMINARY RISK ASSESSMENT - PART 1 Report · 12 Oct 2026 View ↗

Plans & drawings 22

PDF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN AND OUTLINE LOGISTICS Report · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90001 PLANNING APPLICATION 0 - RED LINE BOUNDARY PLAN Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90510 PLANNING APPLICATION 0 - PROPOSED NORTH EAST AND WEST ELEVATIONS Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L01-DR-90210 PLANNING APPLICATION 0 - PROPOSED FLOOR PLAN - LEVEL 1 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90000 PLANNING APPLICATION 0 - LOCATION PLAN Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L00-DR-90200 PLANNING APPLICATION 0 - PROPOSED FLOOR PLAN - GROUND LEVEL Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90530 PLANNING APPLICATION 0 - PROPOSED SECTION THOURGH MACKENZIE WALK Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L01-DR-90040 PLANNING APPLICATION 0 - PARAMETER PLAN - LEVEL 1 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L02-DR-90220 PLANNING APPLICATION 0 - PROPOSED FLOOR PLAN - LEVEL 2 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90511 PLANNING APPLICATION 0 - PROPOSED NORTH AND SOUTH ELEVATIONS Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90520 PLANNING APPLICATION 0 - EXISTING SECTION - MACKENZIE WALK Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L00-DR-90030 PLANNING APPLICATION 0 - PARAMETER PLAN - GROUND LEVEL Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L02-DR-90120 PLANNING APPLICATION 0 - EXISTING FLOOR PLAN - LEVEL 2 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90500 PLANNING APPLICATION 0 - EXISTING NORTH EAST AND WEST ELEVATIONS Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L01-DR-900510 PLANNING APPLICATION 0 - DEMOLITION PLAN - LEVEL 1 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L00-DR-90100 PLANNING APPLICATION 0 - EXISTING FLOOR PLAN - GROUND LEVEL Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L01-DR-90110 PLANNING APPLICATION 0 - EXISTING FLOOR PLAN - LEVEL 1 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L00-DR-900550 APPLICATION 0 - DEMOLITION PLAN - GROUND Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-900545 APPLICATION 0 - DEMOLITION ELEVATIONS - 3 AND 4 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-L02-DR-90052 PLANNING APPLICATION 0 - DEMOLITION PLAN - LEVEL 2 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90054 PLANNING APPLICATION 0 DEMOLITION ELEVATIONS - 1 AND 2 Current Plan · 12 Oct 2026 View ↗ PDF RF5001-ADA-EA-06-LXX-DR-90501 PLANNING APPLICATION 0 - EXISTING NORTH AND SOUTH ELEVATIONS Current Plan · 12 Oct 2026 View ↗

All documents on the council site ↗

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 17 m away: Thames Tideway Tunnel
The site is about 17 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 1947 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: Canary Wharf
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
2 listed buildings within 150 m of the postcode pin
Nearest: Fitch and Sons Works, Grade II, about 42 m from the postcode pin · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area about 70 m away: West India Dock; Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 24 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline Planning Permission
Received
around 12 Oct 2026
Validated
12 Oct 2026
Ward
Canary Wharf
Case officer
Show
Target decision
1 Feb 2027
Decision level
Delegated
Applicant
Show
Agent
DP9

Decision outlook

Day 16 of the 56-day target. Tower Hamlets usually decides commercial and major works by day 69.

Day 1653 days to the predicted decision (day 69)
37%decided within 8 weeks
85%approved
33decided in the last year

Plota live figures for commercial and major works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Site or press notice
29 Oct 2026
Statutory expiry
1 Feb 2027
Env. assessment
Yes
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Major dwellings

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026