5 Kingdom Street London Data via plota.co.uk

26/07127/ADFULL - Approval of Details (Full PP) Pending

Proposal

Details of environmental desk study, contaminated land report and remediation strategy pursuant to partial discharge of Condition 32 (Phases 1-3) of planning permission dated 6th March 2024 (RN: ) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 14 Dec 2026.

Associated applications 2

  • Part of

    VariationApprovedcouncil archive

    Conditions 32 awaiting decision

    • ConditionsDetails of environmental desk study, contaminated land report and remediation strategy…This application26/07127/ADFULL

Site constraints 8

2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
7 listed buildings within 150 m
Nearest: Westbourne Bridge, Grade II, 54 m away · 1 Grade II*, 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Conservation area 51 m away: Bayswater; Inside the City of Westminster built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; National infrastructure project 1398 m away: London Strategic Heat Main Project, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details (Full PP)
Postcode
W2 6PY
Received
19 Oct 2026
Validated
19 Oct 2026
Ward
Hyde Park
Case officer
Show
Target decision
14 Dec 2026
Applicant
Show
Agent
CBRE Ltd

Public comments

No public comments yet.

Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15296316
Planning Portal ref
PP-15296316
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026