Accomodation Arch South East Of Victoria Viaduct Low Lambton Farm Penshaw Houghton-le-Spring Data via plota.co.uk

25/01701/LBC - Listed Building Consent Approved

Proposal

Initial inspections and intrusive works including: Localised ground investigations; Intrusive structural investigations and associated reinstatement. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Jul 2025
✓
Consultation
29 Jul 2025
✓
Approved
17 Sept 2025
✗
Appeal dismissed
23 Dec 2025

Approved on 17 Sept 2025 · Last checked 15 Oct 2026

Site constraints 7

Green belt: Tyne and Wear
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Flood defence 14 m away (natural high ground, designed for a 1 in 2 year flood); Coalfield, development low risk area; Priority habitat 12 m away: Deciduous woodland.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 16 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sunderland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sunderland
Application type
Listed Building Consent
Postcode
NE38 8LQ
Received
28 Jul 2025
Validated
28 Jul 2025
Ward
Washington East
Case officer
Show
Target decision
22 Sept 2025
Decision
Approved
Decision date
17 Sept 2025
Appeal
Dismissed · 23 Dec 2025 · Written Representations · Inspectorate case 3368761 ↗
Applicant
Show
Agent
Arup

How this decision compares

Decided in 51 days from validation, 5 days faster than Sunderland's median of 56 for listed building consent. Approved, as 95% of listed building consent here are.

59%decided within 8 weeks
95%approved
9%go to committee

Plota live figures for listed building consent decided by Sunderland in the last twelve months, from validation. Sunderland decision record →

Public comments

No public comments yet.

Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14211412
Planning Portal ref
PP-14211412
Consultation
29 Jul 2025
Comments by
2 Sept 2025
Site or press notice
12 Aug 2025
Statutory expiry
22 Sept 2025
Env. assessment
No
Sunderland
Planning Authority Score
6.2/10
Average
#94 of 296 councils
Relevant to this application:
Other decisions

Sunderland ranks #99 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sunderland decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #101 of 296
94%
Householder approved
Above avg (90%) #119 of 296
73%
Decided in 8 weeks
Above avg (63%) #99 of 296
37%
Extended time limit
Below avg (41%) #123 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
84%
Major dwellings approved
19 decided (10+ homes)
66%
Change of use approved
58 decided
581
Total decisions
54 refused in the year to March 2026