Land at Proposed London Overground Station, Surrey Canal Road, London, SE14 Data via plota.co.uk

DC/26/144957 - Full Planning Permission Approved

Proposal

Works above the 2001 Transport and Works Act Order vertical limits of deviation (5m above track level) comprising the top of the lift shafts, the top of the parapet walls, rooftop services, including handrails and associated works in connection with the delivery of a new London Overground station at Surrey Canal Road, SE14. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Aug 2026
✓
Consultation
27 Aug 2026
✓
Approved
29 Sept 2026

Approved on 29 Sept 2026 · Delegated · Last checked 5 Oct 2026

Documents 22

Plans & drawings 17

PDF Extract - lul (elle) (no. 2 ) order plans & section Case Copy Documents · 29 Sept 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00046 Proposed sections a-a and b-b rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00047 Proposed sections c-c and d-d rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00048 Proposed sections e-e and f-f rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00049 Proposed sections g-g and h-h rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00050 Proposed north elevation rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00051 Proposed elevation east and west rev 02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00033 Existing ga sections station building rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00034 Existing ga sections rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00035 Existing ga elevation rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00036 Existing ga elevations east and west rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00040 Proposed site block plan rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00042 Proposed platform roof level rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00044 Proposed ga plan rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00029 Existing site location plan rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00030 Existing site bock plan rev p02 Case Copy Drawings · 6 Aug 2026 View ↗ PDF Lr24-msi-prm-e303-drg-ar-00031 Existing site plan rev p02 Case Copy Drawings · 6 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 11

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Small HMO Northern Extension. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Lewisham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 202 m away: Thames Tideway Tunnel
The site is 202 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 607 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; Inside the Lewisham built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square; Designated open space 34 m away.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lewisham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Lewisham
Application type
Full Planning Permission
Postcode
SE14
Received
4 Aug 2026
Validated
4 Aug 2026
Ward
New Cross Gate
Case officer
Show
Target decision
29 Sept 2026
Decision
Granted
Decision date
29 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
TfL - Town Planning and Heritage

How this decision compares

Decided in 56 days from validation, about the council's usual 56 days. Approved, as 82% of full applications here are.

67%decided within 8 weeks
82%approved
464decided in the last year

Plota live figures for full applications decided by Lewisham in the last twelve months, from validation. Lewisham decision record →

Public comments

2comments received
2 supporting

181 neighbours consulted · Last counted 5 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15115854
Planning Portal ref
PP-15115854
Neighbours
27 Aug 2026
Consultation
27 Aug 2026
Statutory expiry
29 Sept 2026
Env. assessment
No
Lewisham
Planning Authority Score
5.8/10
Average
#111 of 296 councils
Relevant to this application:
Householder decisions

Lewisham ranks #127 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Lewisham decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #224 of 296
90%
Householder approved
Above avg (90%) #192 of 296
69%
Decided in 8 weeks
Above avg (63%) #127 of 296
31%
Extended time limit
Below avg (41%) #58 of 296
65%
Minor dwellings approved
117 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
57%
Change of use approved
67 decided
1,303
Total decisions
207 refused in the year to March 2026