563 Fulham Road, London, SW6 1ES Data via plota.co.uk

P/2026/01950/FUL - Full Planning Application REGISTERED: Under Assessment

Proposal

Retention of the mechanical plant equipment comprising of 4no. air conditioning units, 2no. catering condenser, a kitchen extract fan and ductwork plus a supply in-take louvre, to the rear elevation at ground floor level. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jul 2026
✓
Validated
31 Jul 2026
Decision
Target date was 25 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Oct 2026, from Hammersmith and Fulham's recent utility and infrastructure works.

The consultation period closed on 2 Sept 2026.

Licence at this address

  • Licence Wendy's Premises licence · in force Licensed hours: late-night food until 00:30 (Fri-Sat 01:00, Sun midnight)
    Food hygiene rating: 5 (Very good)Inspected 5 Feb 2025

Licensed hours are what the licence permits, not opening times.

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Walham Green conservation area
Also 63. Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Protected view corridor: 9A.1 King Henry's Mound to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Fulham Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 661 m away: Thames Tideway Tunnel
The site is 661 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
2 listed buildings within 150 m
Nearest: FULHAM TOWN HALL (original building and 1904-5 extension), Grade II*, 39 m away · 1 Grade II*, 1 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
SW6 1ES
Received
30 Jul 2026
Validated
31 Jul 2026
Ward
Walham Green
Case officer
Show
Applicant
Show
Agent
James Emblin / Firstplan
Freehold owner
Show

Decision outlook

Day 90, past the statutory target. 58% of utility and infrastructure works in Hammersmith and Fulham are decided within thirteen weeks, which runs to 30 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 9034 days past the 56-day target
28%decided within 8 weeks
98%approved
43decided in the last year

Plota live figures for utility and infrastructure works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
3 Aug 2026
Comments by
2 Sept 2026
Site or press notice
12 Aug 2026
Statutory expiry
25 Sept 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026