Land At Access 18 Access 18 Bristol BS11 8HT Data via plota.co.uk

26/10887/COND - Approval/Discharge of conditions Decided

Proposal

Application for approval of details reserved by condition 19 of permission Erection of 1no. industrial commercial unit (including ancillary offices) with associated lorry, van, car and cycle parking and associated landscaping and infrastructure. (Major appl.) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Mar 2026
✓
Condition application decided
14 Apr 2026

Condition application decided on 14 Apr 2026 · Delegated Decision · Last checked 7 Jul 2026

Associated applications 3

  • Part of

    FullApprovedcouncil archive

    Conditions 19, 25 decided (outcome not recorded)

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project about 473 m away: Hinkley Point C Connection
The site is about 473 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 464 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Avonmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Approval/Discharge of conditions
Postcode
BS11 8HT
Received
2 Mar 2026
Validated
2 Mar 2026
Ward
Avonmouth & Lawrence Weston
Target decision
27 Apr 2026
Decision
Condition application decided
Decision date
14 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Turley

Consultation & key dates

Alt. reference
PP-14658843
Planning Portal ref
PP-14658843
Comments by
14 Apr 2026
Statutory expiry
27 Apr 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 councils
Relevant to this application:
Householder decisions

Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026