Rookery Farm, Northwick Road, Mark, Highbridge, Somerset, TA9 4PG Data via plota.co.uk

33/26/00003 - Full Planning Permission Pending

Proposal

Erection of an agricultural building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jun 2026
Decision
Target date was 25 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 17 Nov 2026; it is now day 121.

Comments are open until 17 Nov 2026

Comment on this application ↗

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 286 m away: Hinkley Point C Connection
The site is about 286 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 82 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 19 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Full Planning Permission
Postcode
TA9 4PG
Received
30 Jun 2026
Validated
30 Jun 2026
Parish
Mark
Case officer
Show
Applicant
Show
Agent
Greenslade Taylor Hunt (Taunton)

Decision outlook

Day 121, past the statutory target. 91% of agricultural works in Sedgemoor are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 12120 days to the predicted decision (day 141)
80%decided within 8 weeks
87%approved
85decided in the last year

Plota live figures for agricultural works decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
19 Oct 2026
Comments by
17 Nov 2026