Thames Industrial Park Princess Margaret Road East Tilbury Essex Data via plota.co.uk

26/01191/TPOCA - Application TPO Conservation Area Awaiting decision

Proposal

T1 - Poplar fell and remove stump limbs are splitting and it is believed to be hollow as were others removed on this estate. T2 - Sycamore 30% reduction required T3 - Sycamore 30% reduction required T4 - Beech 30 % reduction required. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Oct 2026
Decision
Expected by 20 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 20 Nov 2026 and 28 Nov 2026, from Thurrock's recent tree and landscaping works.

Comments are open until 5 Nov 2026

Comment on this application ↗

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
East Tilbury conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: East Tilbury
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
National infrastructure project 300 m away: Lower Thames Crossing
The site is 300 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Thurrock Flexible Generation Plant (decided, 598 m); Norwich to Tilbury (examination closed, recommendation due, 1029 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Nature improvement area: Greater Thames Marshes; Inside the East Tilbury built-up area; Green belt 92 m away: London; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 16 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Thurrock - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Thurrock
Application type
Application TPO Conservation Area
Received
9 Oct 2026
Validated
9 Oct 2026
Ward
East Tilbury Linford And West Tilbury
Case officer
Show
Target decision
20 Nov 2026
Applicant
Show
Agent
Aarons tree surgery

Decision outlook

Day 19 of the 56-day target. Thurrock usually decides tree and landscaping works by day 47.

Day 1937 days to the 56-day target
83%decided within 8 weeks
100%approved
54decided in the last year

Plota live figures for tree and landscaping works decided by Thurrock in the last twelve months, from validation. Thurrock decision record →

Public comments

No public comments yet.

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
5 Nov 2026
Statutory expiry
20 Nov 2026
Env. assessment
No
Thurrock
Planning Authority Score
6/10
Average
#104 of 296 councils
Relevant to this application:
Other decisions

Thurrock is one of the fastest councils in England for householder decisions, ranking #25 out of 296. Thurrock is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Thurrock decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #252 of 296
82%
Householder approved
Below avg (90%) #271 of 296
84%
Decided in 8 weeks
Above avg (63%) #25 of 296
31%
Extended time limit
Below avg (41%) #62 of 296
65%
Minor dwellings approved
74 decided (1-9 homes)
43%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
43 decided
671
Total decisions
124 refused in the year to March 2026