Land West Of Green Lane Denmead Hampshire Data via plota.co.uk

26/01629/TPO - Tree Preservation Order Approved

Proposal

These works are being undertaken on behalf of Scottish and Southern Electricity Networks (SSEN) to prune trees and vegetation away from overhead power lines and associated equipment, ensuring the safe and reliable operation of the electricity network. The works form part of a planned 3-4 year cyclical maintenance programme designed to maintain statutory clearances, improve network reliability, and reduce the risk of power outages. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
✓
Validated
11 Aug 2026
✓
Approved
6 Oct 2026

Approved on 6 Oct 2026 · Delegated Decision · Last checked 7 Oct 2026

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1319 m away: AQUIND Interconnector; Radon affected area, class 2; Inside the Denmead built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Tree Preservation Order
Received
6 Aug 2026
Validated
11 Aug 2026
Ward
DENMEAD WARD
Parish
Denmead Parish Council
Case officer
Show
Target decision
6 Oct 2026
Decision
Application Permitted
Decision date
6 Oct 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 56 days from validation, 11 days slower than Winchester's median of 45 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

71%decided within 8 weeks
99%approved
328decided in the last year

Plota live figures for tree and landscaping works decided by Winchester in the last twelve months, from validation. Winchester decision record →

Consultation & key dates

Alt. reference
PP-15140026
Planning Portal ref
PP-15140026
Statutory expiry
6 Oct 2026
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 councils
Relevant to this application:
Householder decisions

Winchester is slower than most councils at deciding householder applications, ranking #213 out of 296. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026