AWDM/1023/26 - Full Application Registered

Proposal

Proposed change of use from Use Class B2 / B8 to Class E for provision of Indoor Golf Simulator with ancillary cafe on ground floor and bar on first floor Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2026
✓
Validated
8 Sept 2026
✓
Consultation
10 Sept 2026
Decision
Expected by 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Oct 2026, from Adur's recent commercial premises.

The consultation period closed on 1 Oct 2026.

Site constraints 3

National infrastructure project 692 m away: Rampion Offshore Wind Farm
The site is 692 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4; Inside the Lancing and Sompting built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area353 m² (3,800 sq ft)
Energy ratingD (asset rating 100)
UseB8 Storage or Distribution
HeatingAir Conditioning

From the energy performance certificate lodged in March 2017, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Adur - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Adur
Application type
Full Application
Postcode
BN15 8FB
Received
1 Sept 2026
Validated
8 Sept 2026
Ward
Churchill
Parish
Lancing Parish Council
Case officer
Show
Target decision
3 Nov 2026
Applicant
Show
Agent
Breen Planning

Decision outlook

Day 51, past Adur's usual 46 days for commercial premises. 93% are decided within thirteen weeks, so most likely by 8 Dec 2026.

Day 515 days to the 56-day target
67%decided within 8 weeks
97%approved
7%go to committee

Plota live figures for commercial premises decided by Adur in the last twelve months, from validation. Adur decision record →

Public comments

1comment received
1 objecting

7 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15177088
Planning Portal ref
PP-15177088
Neighbours
9 Sept 2026
Consultation
10 Sept 2026
Comments by
1 Oct 2026
Site or press notice
10 Sept 2026
Statutory expiry
3 Nov 2026
Env. assessment
No
Adur
Planning Authority Score
6/10
Average
#103 of 296 councils
Relevant to this application:
Change of use

Adur ranks #181 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Adur decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #49 of 296
96%
Householder approved
Above avg (90%) #48 of 296
60%
Decided in 8 weeks
Below avg (63%) #181 of 296
38%
Extended time limit
Below avg (41%) #125 of 296
70%
Minor dwellings approved
20 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
100%
Change of use approved
5 decided
298
Total decisions
20 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.