CEC Mill Island Waterload, Nantwich, CW5 5HT Data via plota.co.uk

26/3880/TCA - Works to trees in Conservation Area Pending Consideration

Proposal

Works: cut back from property /clear FP 1070108837 Tree Group. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2026
Decision
Expected by 4 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 14 Dec 2026 and 29 Dec 2026, from Cheshire East's recent tree and landscaping works.

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Flood defence 15 m away (natural high ground, designed for a 1 in 5 year flood); 8 listed buildings within 150 m; Priority habitat 0 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 28 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to trees in Conservation Area
Postcode
CW5 5HT
Received
23 Oct 2026
Validated
23 Oct 2026
Case officer
Show
Target decision
4 Dec 2026
Decision level
Delegation
Applicant
Show

Decision outlook

Day 6 of the 56-day target. Cheshire East usually decides tree and landscaping works by day 57.

Day 651 days to the predicted decision (day 57)
49%decided within 8 weeks
96%approved
644decided in the last year

Plota live figures for tree and landscaping works decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Statutory expiry
4 Dec 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 councils
Relevant to this application:
Other decisions

Cheshire East is one of the slowest councils in England for householder decisions, ranking #268 out of 296. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026