Boiler House York District Hospital Wigginton Road York Data via plota.co.uk

26/01657/FUL - Full Application Awaiting decision

Proposal

Erection of a single storey switch room building to house essential electrical infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
✓
Validated
14 Sept 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 4 Nov 2026, from York's recent utility and infrastructure works.

Comments are open until 4 Nov 2026

Comment on this application ↗

Site constraints 16

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
3 Article 4 directions
Site allocation NSP52: London Bridge Health Cluster · Central Activities Zone · London Bridge District Town Centre. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Tree preservation order: Guys Hospital Cancer Centre Snowsfields
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Archaeological priority area: North Southwark and Roman Roads
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 226 m away: Thames Tideway Tunnel
The site is 226 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 256 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Town centre: London Bridge
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Scheduled monument 88 m away: Roman riverboat, 136m west of Greenwood Theatre
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
10 listed buildings within 150 m
Nearest: Guys Hospital Main Building Including Wings and Chapel, Grade II*, 26 m away · 2 Grade II*, 7 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Conservation area 17 m away: Borough High Street
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Wider setting of protected view 2A.1 Parliament Hill summit to St Paul's Cathedral; 3A.1 Kenwood viewing gazebo to St Paul's Cathedral; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Heritage at risk 88 m away: Roman boat at New Guy's House, Bermondsey.
Not affected
Not green belt

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in York - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
York
Application type
Full Application
Received
11 Sept 2026
Validated
14 Sept 2026
Ward
Guildhall
Parish
Guildhall Planning Panel
Case officer
Show
Target decision
9 Nov 2026
Applicant
Show
Agent
Bartlett | Mettham

Decision outlook

Day 44, past York's usual 27 days for utility and infrastructure works. 92% are decided within thirteen weeks, so most likely by 14 Dec 2026.

Day 4412 days to the 56-day target
74%decided within 8 weeks
89%approved
70decided in the last year

Plota live figures for utility and infrastructure works decided by York in the last twelve months, from validation. York decision record →

Public comments

3comments received
2 objecting1 neutral

67% object · below the UK average of 74%

6 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15176251
Planning Portal ref
PP-15176251
Comments by
4 Nov 2026
Statutory expiry
9 Nov 2026
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Householder decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026