Land Adjacent To 6-12 Tabard Street London SE1 4JU Data via plota.co.uk

26/AP/3098 - S.73 Vary/Remove Conds/Minor Alterations Under consideration/assessment

Proposal

Amendments to Condition 2- For full planning permission Ref dated 08/08/2016 for Erection of a new building on an empty site comprising of 6 storeys above ground with a basement level below comprising commercial B1(a) office use at ground and and basement levels and residential on the upper floors (3x2 bedroom flats and a single 1 bedroom mezzanine flat) with associated landscape works The amendment seeks to allow the substitution of drawings which show compliance with Approved Document B (Fire) and otherwise improve the quality of the accommodation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
✓
Validated
21 Oct 2026
Decision
Expected by 15 Dec 2026

Under consideration

No decision has been issued yet. A decision is expected by 15 Dec 2026.

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2 variation sought

    • VariationAmendments to Condition 2- For fullThis application26/AP/3098

Site constraints 14

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Central Activities Zone · Site allocation NSP09: Swan Street Cluster. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: North Southwark and Roman Roads
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 514 m away: Thames Tideway Tunnel
The site is 514 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 48 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
4 listed buildings within 150 m
Nearest: 19, Tabard Street, Grade II, 28 m away · 1 Grade II*, 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Also on the record
Conservation area 26 m away: Borough High Street; Wider setting of protected view 1A.2 Alexandra Palace viewing terrace to St Paul's Cathedral; Inside the Southwark built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 44 m away; Town centre 70 m away: Bankside and The Borough.
Not affected
Not green belt · No scheduled monument at the site

Checked on 23 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
S.73 Vary/Remove Conds/Minor Alterations
Postcode
SE1 4JU
Received
20 Oct 2026
Validated
21 Oct 2026
Ward
Chaucer
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
15 Dec 2026
Applicant
Show
Agent
KR Planning

Public comments

No public comments yet.

Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
15 Dec 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026