Womersley Road (Land Off) Knottingley Data via plota.co.uk

25/01279/FUL - Full Application Awaiting decision

Proposal

residential development of 2no. dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jul 2025
✓
Validated
30 Jul 2025
✓
Consultation
21 Apr 2026
Decision
Target date was 24 Sept 2025

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 12 May 2026; it is now day 456.

The consultation period closed on 12 May 2026.

Site constraints 4

National infrastructure project: Knottingley Power Project
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: East Coast Hydrogen Humber Pipeline (at pre-application, about 337 m); Ferrybridge Next Generation Power Station (at pre-application, about 1311 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Knottingley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Full Application
Received
1 Jul 2025
Validated
30 Jul 2025
Ward
Knottingley
Case officer
Show
Target decision
24 Sept 2025
Applicant
Show

Decision outlook

Day 456, past the statutory target. 77% of full applications in Wakefield are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 23 Oct 2026.

Day 456400 days past the 56-day target
42%decided within 8 weeks
92%approved
605decided in the last year

Plota live figures for full applications decided by Wakefield in the last twelve months, from validation. Wakefield decision record →

Public comments

1comment received
1 objecting

5 neighbours consulted · Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14127762
Planning Portal ref
PP-14127762
Neighbours
14 Aug 2025
Consultation
21 Apr 2026
Comments by
12 May 2026
Site or press notice
29 Aug 2025
Statutory expiry
24 Sept 2025
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Householder decisions

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026