Borough Triangle Land And Site At 18-54 Newington Causeway 69 Borough Road 82-83 Borough Road London Southwark SE1 6DR Data via plota.co.uk

26/AP/0677 - S.73 Vary/Remove Conds/Minor Alterations Under consideration/assessment

Proposal

Variation of Conditions 1 (approved plans, including affordable housing) and 45 (Wheelchair adaptable user dwellings) and 49 (fire safety) pursuant to planning permission (Phased mixed-use redevelopment of the site comprising: Demolition of all existing buildings/structures and site clearance, except 82 and (part) 83 Borough Road which are to be retained, altered and refurbished for Flexible Commercial, Business and Service, and Learning and Non-Residential Institution Uses (Class E/F1 / F2(b)); - Construction of basement structure and vehicular access; - Construction of buildings to provide Dwellings (Class C3), Flexible Commercial, Business and Service and mixed food and drink and leisure uses (including drinking establishments with expanded food provision, hot food takeaways, live music performance venue and cinema) (Class E / Sui Generis) and public toilets; and - Provision of associated car and cycle parking, open space and landscaping, means of access and highway alterations, installation of plant and utilities and all other associated ancillary works incidental to the development) For Information: The amendments include: - revised internal configuration of stair/lift cores - consequential revisions to internal configuration of the residential accommodation including floorspace, minor reconfiguration of the landscaping at the roof terrace of Building D, and to the layout of the basement - reducing the total quantum of affordable housing to a minimum 10% provided on-site and a consequential change to the quantum of affordable wheelchair accessible homes. Data via plota.co.uk

View original council record ↗

Application progress

Received
6 Mar 2026
Validated
18 Mar 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 150

Plans & drawings 124

PDF P21116-00-001-GIL-0153 REV 01 GA BLOCK C & D ROOF TERRACE Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-DRG-AR-00130005 REV PL5 PROPOSED ELEVATION - NEWINGTON CAUSEWAY Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-DRG-AR-00130004 REV PL5 PROPOSED ELEVATION - BOROUGH ROAD Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-00-DRG-AR-00210000 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 00 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-00-DRG-AR-00210001 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 00- MEZZANINE 1 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-00-DRG-AR-00210002 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 00- MEZZANINE 2 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-01-DRG-AR-00210010 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 01 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-02-DRG-AR-00210020 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 02 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-B1-DRG-AR-00210910 REV PL5 SCHEMATIC FLOOR PLAN - BASEMENT LOWER LEVEL - B1 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-B1-DRG-AR-00210911 REV PL5 SCHEMATIC FLOOR PLAN - BASEMENT MEZZANINE LEVEL - B1M Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-B2-DRG-AR-00210920 REV PL5 SCHEMATIC FLOOR PLAN - BASEMENT PITS LEVEL - B2 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-06-DRG-AR-00210060 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 06-09 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-10-DRG-AR-00210100 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 10 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-11-DRG-AR-00210110 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 11-12 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-13-DRG-AR-00210130 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 13 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-14-DRG-AR-00210140 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 14 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-02-DRG-AR-00210021 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 02- MEZZANINE 3 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-03-DRG-AR-00210030 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 03 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-04-DRG-AR-00210040 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 04 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-05-DRG-AR-00210050 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 05 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-23-DRG-AR-00210260 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 26-27 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-28-DRG-AR-00210280 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 28 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-11-DRG-AR-00210290 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 29 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-30-DRG-AR-00210300 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 30 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-31-DRG-AR-00210310 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 31 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-32-DRG-AR-00210320 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 32 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-15-DRG-AR-00210150 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 15-16 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-17-DRG-AR-00210170 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 17 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-18-DRG-AR-00210180 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 18 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-18-DRG-AR-00210190 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 19-25 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-42-DRG-AR-00210420 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 42 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-43-DRG-AR-00210430 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 43 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-44-DRG-AR-00210440 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 44 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-45-DRG-AR-00210450 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 45 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-50-DRG-AR-00210500 REV PL5 SCHEMATIC FLOOR PLAN - ROOF PLAN Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-11-DRG-AR-00210330 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 33-35 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-11-DRG-AR-00210360 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 36 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-11-DRG-AR-00210370 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 37 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-39-DRG-AR-00210380 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 38 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-XX-40-DRG-AR-00210390 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 39 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-40-DRG-AR-00210400 REV PL5 SCHEMATIC FLOOR PLAN - LEVEL 40-41 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-03- DRG-AR-00311030 REV PL5 BUILDING A L 03 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-04- DRG-AR-00311040 REV PL5 BUILDING A L 04 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-05- DRG-AR-00311050 REV PL5) BUILDING A L 05-12 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-13- DRG-AR-00311130 REV PL5 BUILDING A L 13 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-14- DRG-AR-00311140 REV PL5 BUILDING A L 14-15 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-00- DRG-AR-00311000 REV PL5 BUILDING A L 00 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-00- DRG-AR-00311001 REV PL5 BUILDING A L 00M Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-01- DRG-AR-00311010 REV PL5 BUILDING A L 01 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-02- DRG-AR-00311020 REV PL5 BUILDING A L 02 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-02- DRG-AR-00311021 REV PL5 BUILDING A L 02M Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-29- DRG-AR-00311290 REV PL5 BUILDING A L 29 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-30- DRG-AR-00311300 REV PL5 BUILDING A L 30 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-31- DRG-AR-00311310 REV PL5 BUILDING A L 31-35 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-36- DRG-AR-00311360 REV PL5 BUILDING A L 36 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-37- DRG-AR-00311370 REV PL5 BUILDING A L 37 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-38-DRG-AR-00311380 REV PL5 A L 38 AND L 39 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1- 40-DRG-AR-00311400 REV PL5 BUILDING A ROOF PLAN Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-16- DRG-AR-00311160 REV PL5 BUILDING A L 16-18 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-19- DRG-AR-00311190 REV PL5 BUILDING A L 19-24 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-25- DRG-AR-00311250 REV PL5 BUILDING A L 25 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-26- DRG-AR-00311260 REV PL5 BUILDING A L 26-27 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-28- DRG-AR-00311280 REV PL5 BUILDING A L 28 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-04- DRG-AR-00312040 REV PL5 BUILDING B L 04 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-05- DRG-AR-00312050 REV PL5 BUILDING B L 05-12 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-13- DRG-AR-00312130 REV PL5 BUILDING B L 13 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-00- DRG-AR-00312000 REV PL5 BUILDING B L 00 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-00- DRG-AR-00312001 REV PL5 BUILDING B L 00M Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-00- DRG-AR-00312002 REV PL5 BUILDING B L 00M1 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-01- DRG-AR-00312010 REV PL5 BUILDING B L 01-02 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-03- DRG-AR-00312030 REV PL5 BUILDING B L 03 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-25- DRG-AR-00312250 REV PL5 BUILDING B L 25-28 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-29- DRG-AR-00312290 REV PL5 BUILDING B L 29-31 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-32- DRG-AR-00312320 REV PL5 BUILDING B L 32 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-33- DRG-AR-00312330 REV PL5 BUILDING B L 33 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-14- DRG-AR-00312140 REV PL5 BUILDING B L 14-23 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-24- DRG-AR-00312240 REV PL5 BUILDING B L 24 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-42- DRG-AR-00312420 REV PL5 BUILDING B L 42 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-43- DRG-AR-00312430 REV PL5 BUILDING B L 43 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-44- DRG-AR-00312440 REV PL5 BUILDING B L 44-45 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1- 50-DRG-AR-00312500 REV PL5 BUILDING B ROOF PLAN Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-34- DRG-AR-00312340 REV PL5 BUILDING B L 34-36 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-B1-37- DRG-AR-00312370 REV PL5 BUILDING B L 37-41 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-04- DRG-AR-00313040 REV PL5 BUILDING C L 04 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-05-DRG-AR-00313050 REV PL5 BUILDING C L 05-06 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-07- DRG-AR-00313070 REV PL5 BUILDING C L 07-09 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-10- DRG-AR-00313100 REV PL5 BUILDING C L 10 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-11- DRG-AR-00313110 REV PL5 BUILDING C L 11-13 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-14- DRG-AR-00313140 REV PL5 BUILDING C L 14 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-CX-15-DRG-AR-00313150 REV PL5 BUILDING C ROOF PLAN Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-00- DRG-AR-00313001 REV PL5 BUILDING C L 00M Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-01- DRG-AR-00313010 REV PL5 BUILDING C L 01 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-02- DRG-AR-00313020 REV PL5 BUILDING C L 02-03 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-01- DRG-AR-00314010 REV P022.04 BUILDING D L 01 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-02- DRG-AR-00314020 REV PL5 BUILDING D L 02 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-03- DRG-AR-00314030 REV P022.04 BUILDING D L 03 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-04- DRG-AR-00314040 REV P022.04 BUILDING D L 04 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-05- DRG-AR-00314050 REV PL5 BUILDING D L 05 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-00- DRG-AR-00314000 REV PL5 BUILDING D L 00 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-00- DRG-AR-00314001 REV PL5 BUILDING D L 00M Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-16- DRG-AR-00314160 REV PL5 BUILDING D L 16 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-17- DRG-AR-00314170 REV PL5 BUILDING D L 17 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-18- DRG-AR-00314180 REV PL5 BUILDING D L 18 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1- 18-DRG-AR-00314190 REV PL5 BUILDING D L 19 ROOF Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-06- DRG-AR-00314060 REV P022.04 BUILDING D L 06-10 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-06- DRG-AR-00314110 REV P022.04 BUILDING D L 11-15 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-D1-XX-DRG-AR-00334002 REV PL5 BUILDING D NORTH ELEVATION Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-D1-XX-DRG-AR-00334000 REV PL5 BUILDING D SOUTH ELEVATION Plan - Proposed · 6 Mar 2026 View ↗ PDF E505- MLA-D1-XX-DRG-AR-00334001 REV PL5 BUILDING D WEST ELEVATION Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-XX-DRG-AR-00334003 REV PL5 BUILDING D EAST ELEVATION Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1- XX-DRG-AR-00334004 REV PL5 BUILDING D GABLE WALL Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-C1-XX-XX-DRG-AR-00613304 REV PL5 2B-3P - 3304A Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611305 REV PL5 2B-3P-WA - 1305-2305 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-XX-XX-DRG-AR-00614301 REV PL5 2B-3P-WA - 4301 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611403 REV PL5 2B-4P - 1403-2403 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611201 REV PL5 1B-2P - 1201-2201 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-XX-XX-DRG-AR-00614202 REV PL5 1B-2P - 4202 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611207 REV PL5 1B-2P-WA - 1207-2207 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-XX-XX-DRG-AR-00614412 REV PL5 3B-4P-WA - 4412 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-A1-XX-XX-DRG-AR-00611501 REV PL5 3B-5P - 1501 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611504 REV PL5 3B-5P - 1504-2504 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611101 REV PL5 STUDIO - 1101-2101 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-XX-XX-XX-DRG-AR-00611406 REV PL5 2B-4P - 1406-2406 Plan - Proposed · 6 Mar 2026 View ↗ PDF E505-MLA-D1-XX-XX-DRG-AR-00614410 REV PL5 2B-4P-WA - 4410 Plan - Proposed · 6 Mar 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in Southwark - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
Southwark
Application type
S.73 Vary/Remove Conds/Minor Alterations
Postcode
SE1 6DR
Received
6 Mar 2026
Validated
18 Mar 2026
Ward
Borough & Bankside
Parish
Borough, Bankside And Walworth
Case officer
Show
Target decision
8 Jul 2026
Agent
Lichfields

Public comments

59comments received
57 objecting2 supporting

97% object · above the UK average of 76%

17,790 neighbours consulted · Last counted 22 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
Yes
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision performance
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026