Bridge Farm Frodingham Bridge Church Lane North Frodingham East Riding Of Yorkshire YO25 8JR Data via plota.co.uk

26/01386/AGNOT - Prior Approval Agricultural Development Approved

Proposal

Erection of a general purpose agricultural building to provide general storage and machinery storage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jun 2026
✓
Approved
24 Jun 2026

Approved on 24 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI about 22 m away: River Hull Headwaters SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Priority Rivers
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1181 m away: Hornsea Project Four Offshore Wind Farm; Flood defence about 23 m from the postcode pin (bridge abutment, designed for a 1 in 20 year flood); Priority habitat about 12 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval Agricultural Development
Postcode
YO25 8JR
Received
2 Jun 2026
Validated
2 Jun 2026
Ward
East Wolds And Coastal
Parish
Foston Parish Council
Case officer
Show
Target decision
30 Jun 2026
Decision
Prior Approval Not Required
Decision date
24 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Ullyotts

How this decision compares

Decided in 22 days from validation, 15 days faster than East Riding's median of 37 for agricultural works. Approved, as 87% of agricultural works here are.

86%decided within 8 weeks
87%approved
123decided in the last year

Plota live figures for agricultural works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Consultation & key dates

Alt. reference
PP-14979449
Planning Portal ref
PP-14979449
Comments by
24 Jun 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026