38 Esplanade Redcar TS10 3AG Data via plota.co.uk

Proposal

Installation of extraction flues at side Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Apr 2026
✓
Validated
26 May 2026
−
Withdrawn
20 Jul 2026

Withdrawn on 20 Jul 2026 · Last checked 14 Sept 2026

Site constraints 11

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Special protection area about 40 m away: Teesmouth and Cleveland Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 40 m away: Teesmouth and Cleveland Coast SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Filey Brigg to Newport Bridge about 22 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
Nature recovery project: Tees Estuary Recovering Nature (TERN); National infrastructure project about 1802 m away: The Net Zero Teesside Project; Flood defence about 30 m from the postcode pin (wall, designed for a 1 in 300 year flood); 1 listed building within 150 m of the postcode pin; Inside the Redcar built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Redcar and Cleveland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
TS10 3AG
Received
30 Apr 2026
Validated
26 May 2026
Case officer
Show
Decision
WITHDRAWN
Decision date
20 Jul 2026
Applicant
Show

Consultation & key dates

Consultation
28 May 2026
Comments by
25 Jun 2026
Redcar and Cleveland
Planning Authority Score
6.8/10
Good
#69 of 296 councils
Relevant to this application:
Householder decisions

Redcar and Cleveland ranks #169 out of 296 councils for householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Redcar and Cleveland decision statistics
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #15 of 296
96%
Householder approved
Above avg (90%) #58 of 296
62%
Decided in 8 weeks
Below avg (63%) #169 of 296
30%
Extended time limit
Below avg (41%) #56 of 296
78%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
95%
Change of use approved
37 decided
418
Total decisions
16 refused in the year to March 2026