Advert Right Site 193 Forton Road Gosport Hampshire Data via plota.co.uk

26/00178/ADVT - Advert application Refused

Proposal

Erection of 1no. Internally illuminated digital display screen to replace existing paper hoarding Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 May 2026
✓
Consultation
27 May 2026
✗
Refused
20 Jul 2026
Appeal
Not lodged

Refused on 20 Jul 2026 · Delegated Decision · Last checked 21 Jul 2026

Documents 6

Consultation & comments 2

PDF Commenter’s name hidden Show Public Comment · 3 Jul 2026 View ↗
PDF Commenter’s name hidden Show Public Comment · 3 Jun 2026 View ↗

All documents on the council site ↗

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Special protection area 370 m away: Portsmouth Harbour; SSSI 370 m away: Portsmouth Harbour SSSI; Inside the Gosport built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gosport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gosport
Application type
Advert application
Postcode
PO12 3HB
Received
26 May 2026
Validated
26 May 2026
Ward
Forton
Case officer
Show
Target decision
21 Jul 2026
Decision
Refuse
Decision date
20 Jul 2026
Decision level
Delegated Decision
Agent
Carter Jonas

How this decision compares

Decided in 55 days from validation, about the council's usual 54 days. Refused, as 8% of advertisement consent here are.

75%decided within 8 weeks
92%approved
12decided in the last year

Plota live figures for advertisement consent decided by Gosport in the last twelve months, from validation. Gosport decision record →

Consultation & key dates

Alt. reference
PP-14944357
Planning Portal ref
PP-14944357
Neighbours
10 Jul 2026
Consultation
27 May 2026
Comments by
19 Jun 2026
Site or press notice
28 May 2026
Statutory expiry
21 Jul 2026
Env. assessment
No
Gosport
Planning Authority Score
8.3/10
Excellent
#19 of 296 councils
Relevant to this application:
Other decisions

Gosport is faster than most councils at deciding householder applications, ranking #66 out of 296. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gosport decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #38 of 296
97%
Householder approved
Above avg (90%) #32 of 296
76%
Decided in 8 weeks
Above avg (63%) #66 of 296
30%
Extended time limit
Below avg (41%) #54 of 296
67%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
85%
Change of use approved
13 decided
226
Total decisions
13 refused in the year to March 2026