STREET RECORD Stockton Lane York Data via plota.co.uk

26/01471/OHL - Overhead Electricity Lines Decided

Proposal

Replacement of a section of low voltage overhead line with ABC conductor Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
Decision
Target date was 4 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 82.

Site constraints 4

Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Also on the record
National infrastructure project about 1894 m away: Yorkshire GREEN; Green belt about 4 m away: York; Inside the York built-up area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in York - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
York
Application type
Overhead Electricity Lines
Received
7 Aug 2026
Validated
7 Aug 2026
Ward
Strensall
Parish
Stockton-on-the-Forest Parish Council
Case officer
Show
Target decision
4 Sept 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 82, past the statutory target. 92% of utility and infrastructure works in York are decided within thirteen weeks, which runs to 6 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 8226 days past the 56-day target
74%decided within 8 weeks
89%approved
70decided in the last year

Plota live figures for utility and infrastructure works decided by York in the last twelve months, from validation. York decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
4 Sept 2026
Env. assessment
No
York
Planning Authority Score
3.7/10
Below average
#213 of 296 councils
Relevant to this application:
Householder decisions

York ranks #156 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
York decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #255 of 296
87%
Householder approved
Below avg (90%) #237 of 296
64%
Decided in 8 weeks
Above avg (63%) #156 of 296
42%
Extended time limit
Above avg (41%) #168 of 296
69%
Minor dwellings approved
104 decided (1-9 homes)
71%
Major dwellings approved
17 decided (10+ homes)
63%
Change of use approved
68 decided
1,278
Total decisions
224 refused in the year to March 2026