Former Laundry Site Rear Of No.s 9 - 61 Pennard Road W12 Data via plota.co.uk

P/2026/01884/FUL - Full Planning Application REGISTERED: Under Consultation

Proposal

Retention of the existing shipping containers on site for a temporary period of 12 months as creative and affordable workspace units and ancillary storage [Class E]. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2026
✓
Validated
23 Jul 2026
Decision
Target date was 17 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 2 Nov 2026; it is now day 97.

Comments are open until 2 Nov 2026

Comment on this application ↗

Site constraints 9

Shepherds Bush conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shepherds Bush Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
National infrastructure project 972 m away: Thames Tideway Tunnel
The site is 972 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W12 8DW
Received
22 Jul 2026
Validated
23 Jul 2026
Ward
Shepherd's Bush Green
Case officer
Show
Applicant
Show

Decision outlook

Day 97, past the statutory target. 84% of commercial premises in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 976 days to the predicted decision (day 103)
45%decided within 8 weeks
96%approved
81decided in the last year

Plota live figures for commercial premises decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
28 Jul 2026
Comments by
2 Nov 2026
Site or press notice
5 Aug 2026
Statutory expiry
17 Sept 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026