Land at Sterte Avenue West now St Modwen Park Sterte Avenue West Poole BH15 2FU Data via plota.co.uk

P/26/01476/FUL - Full Planning Permission Approved

Proposal

Site alterations comprising the installation of plant and associated works to facilitate electric vehicle charging infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Apr 2026
✓
Validated
23 Apr 2026
✓
Approved
23 Jun 2026

Approved on 23 Jun 2026 · Delegated · Last checked 30 Sept 2026

Site constraints 7

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Ramsar wetland about 184 m away: Poole Harbour
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 184 m away: Poole Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Nature improvement area: Wild Purbeck.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Full Planning Permission
Postcode
BH15 2FU
Received
1 Apr 2026
Validated
23 Apr 2026
Ward
Poole Town
Case officer
Show
Decision
Granted
Decision date
23 Jun 2026
Decision level
Delegated
Applicant
Show
Agent
DWDLTD

How this decision compares

Decided in 61 days from validation, 6 days slower than BCP's median of 55 for utility and infrastructure works. Approved, as 82% of utility and infrastructure works here are.

68%decided within 8 weeks
82%approved
31decided in the last year

Plota live figures for utility and infrastructure works decided by BCP in the last twelve months, from validation. BCP decision record →

Consultation & key dates

Consultation
27 Apr 2026
Comments by
2 Jun 2026
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026