Land Rear Of 3-4 Oaklea Passage Kingston Upon Thames Data via plota.co.uk

26/01387/FUL - Full Application Pending Consideration

Proposal

Erection of purpose-built 10nos. bedroom/10nos. person HMO (Use Class Sui Generis) with associated parking, bins and cycle provision Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Jun 2026
✓
Validated
29 Jul 2026
✓
Consultation
30 Sept 2026
Decision
Expected by 30 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 14 Oct 2026; it is now day 91.

The consultation period closed on 14 Oct 2026.

Documents 44

All documents on the council site ↗

Site constraints 10

Grade II listed: 4, Oaklea Passage
List entry 1253326 · The pin is inside its outline · 11 more listed buildings within 150 m (2 Grade II*, 2 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 11 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Kingston
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Conservation area 80 m away: Riverside South Conservation Area; SSSI 446 m away: Bushy Park and Home Park SSSI; Inside the Kingston upon Thames built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
25 Jun 2026
Validated
29 Jul 2026
Ward
Kingston Town
Parish
Kingston And North Kingston
Case officer
Show
Target decision
30 Oct 2026
Applicant
Show

Decision outlook

Day 91, past the statutory target. 94% of changes of use in Kingston upon Thames are decided within thirteen weeks, which runs to 28 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.

Day 9135 days past the 56-day target
76%decided within 8 weeks
70%approved
113decided in the last year

Plota live figures for changes of use decided by Kingston upon Thames in the last twelve months, from validation. Kingston upon Thames decision record →

Public comments

No public comments yet.

42 neighbours consulted · Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15039552
Planning Portal ref
PP-15039552
Neighbours
13 Aug 2026
Consultation
30 Sept 2026
Comments by
14 Oct 2026
Statutory expiry
23 Sept 2026
Env. assessment
No
Kingston upon Thames
Planning Authority Score
6.5/10
Good
#76 of 296 councils
Relevant to this application:
Householder decisions

Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Kingston upon Thames decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #288 of 296
82%
Householder approved
Below avg (90%) #266 of 296
81%
Decided in 8 weeks
Above avg (63%) #33 of 296
20%
Extended time limit
Below avg (41%) #18 of 296
44%
Minor dwellings approved
124 decided (1-9 homes)
60%
Major dwellings approved
10 decided (10+ homes)
42%
Change of use approved
26 decided
1,112
Total decisions
274 refused in the year to March 2026