Redwood Farm, Withy Road, East Huntspill, Highbridge, Somerset, TA9 3NW Data via plota.co.uk

Proposal

Change of Use & conversion of existing agricultural building to 2No. holiday lets, and alterations to cladding & roofing materials. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Jan 2026
✓
Approved
10 Mar 2026

Approved on 10 Mar 2026 · Last checked 20 Sept 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Somerset Coast, Levels and Moors; National infrastructure project about 1750 m away: Hinkley Point C Connection; National nature reserve about 484 m away: Somerset Wetlands.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area195 m² (2,099 sq ft)
Energy ratingC (72 out of 100), could reach B
PropertyDetached house
Built1900
HeatingBoiler and underfloor heating, LPG
WallsAverage thermal transmittance 0.34 W/m²K

From the energy performance certificate lodged in December 2017, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Full Planning Permission
Postcode
TA9 3NW
Received
23 Jan 2026
Validated
23 Jan 2026
Parish
East Huntspill
Case officer
Show
Decision
Granted Permission
Decision date
10 Mar 2026
Applicant
Show
Agent
APW Planning Consultants, 30 Maxwell Street

How this decision compares

Decided in 46 days from validation, 19 days slower than Sedgemoor's median of 27 for agricultural works. Approved, as 87% of agricultural works here are.

80%decided within 8 weeks
87%approved
85decided in the last year

Plota live figures for agricultural works decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
3 Feb 2026
Comments by
7 Mar 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.