Hen Ffald, Trerhyngyll, Cowbridge Data via plota.co.uk

2026/00041/FUL - Full Planning Application Approved

Proposal

Erection of a single storey rear extension, erection of a two storey side extension, replacement of the existing front porch with a larger porch, installation of rooflights and solar panels, and external wall cladding and rendering, together with associated external alterations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Jan 2026
✓
Approved
9 Mar 2026

Approved on 9 Mar 2026 · Delegated · Last checked 14 Sept 2026

Site constraints 2

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Glamorgan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Glamorgan
Application type
Full Planning Application
Postcode
CF71 7TP
Received
19 Jan 2026
Validated
19 Jan 2026
Ward
Cowbridge
Parish
Penllyn Community Council
Case officer
Show
Target decision
16 Mar 2026
Decision
Approved
Decision date
9 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
DesignServe

How this decision compares

Decided in 49 days from validation, 7 days faster than Glamorgan's median of 56 for extensions. Approved, as 91% of extensions here are.

51%decided within 8 weeks
91%approved
334decided in the last year

Plota live figures for extensions decided by Glamorgan in the last twelve months, from validation. Glamorgan decision record →

Consultation & key dates

Comments by
17 Feb 2026
Committee
9 Mar 2026