Avondale, Brook End, Luckington, Chippenham, SN14 6PJ Data via plota.co.uk

PL/2026/00738 - Notification of proposed works to trees in a conservation area Approved

Proposal

T1 Weeping Willow - Re-pollard; T2 Field Maple - Crown reduction by up to 20–30%; T3 Ash - Pollard Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Feb 2026
✓
Approved
5 Mar 2026

Approved on 5 Mar 2026 · Last checked 21 Aug 2026

Site constraints 11

1 listed building within 150 m of the postcode pin
Nearest: Elizabethan Cottage, Grade II, about 0 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Cotswolds National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Luckington conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 899 m away: Lime Down Solar Project
The site is about 899 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Flood defence about 32 m from the postcode pin (natural high ground, designed for a 1 in 2 year flood); Inside the Luckington built-up area; Priority habitat about 35 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 4

Last sold for £400,000 in June 2014. Detached house, freehold.

27 June 2014£400,000
25 October 2011£417,500
9 November 2007£382,500
17 July 2001£248,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area112 m² (1,206 sq ft)
Energy ratingE (43 out of 100), could reach B
PropertyDetached bungalow, 6 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, oil
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2013, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wiltshire
Application type
Notification of proposed works to trees in a conservation area
Postcode
SN14 6PJ
Received
3 Feb 2026
Validated
3 Feb 2026
Ward
Sherston ED
Parish
Luckington & Alderton CP
Case officer
Show
Target decision
5 Mar 2026
Decision
No Objection
Decision date
5 Mar 2026

How this decision compares

Decided in 30 days from validation, 8 days faster than Wiltshire's median of 38 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

95%decided within 8 weeks
99%approved
1,246decided in the last year

Plota live figures for tree and landscaping works decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →

Public comments

1comment received
1 neutral

Last counted 21 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
4 Mar 2026
Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 councils
Relevant to this application:
Other decisions

Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.