810-812 High Road Tottenham London N17 0DH Data via plota.co.uk

HGY/2026/0313 - Approval of details reserved by a condition Approved

Proposal

Submission of details to discharge Condition 6 (Hours of operation) attached to Planning Permission approved on 08/06/2017, in relation to 810-812 High Road, Tottenham, London, N17 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 5 Feb 2026
✓
Approved
29 May 2026

Approved on 29 May 2026 · Delegated Decision · Last checked 22 Aug 2026

Associated applications 7

Site constraints 10

14 listed buildings within 150 m of the postcode pin
Nearest: 798-802, High Road N17, Grade II, the postcode pin is inside its outline · 4 Grade II*, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 14 with distances
Historic England ↗
THRHC/North Tottenham conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
High Road East. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Heritage at risk: North Tottenham High Road
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Archaeological priority area: Summary and Definition&nbsp
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Haringey AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 1033 m away: North London (Electricity Line) Reinforcement
The site is about 1033 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: North London Heat and Power Project (decided, about 1935 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Haringey built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Haringey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Haringey
Application type
Approval of details reserved by a condition
Postcode
N17 0DH
Received
around 5 Feb 2026
Validated
5 Feb 2026
Ward
Northumberland Park
Case officer
Show
Decision
Approve
Decision date
29 May 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 22 Aug 2026

Read the comments on the council site ↗

Haringey
Planning Authority Score
4/10
Below average
#192 of 296 councils
Relevant to this application:
Major dwellings

Haringey is slower than most councils at deciding householder applications, ranking #209 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Haringey decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #206 of 296
91%
Householder approved
Above avg (90%) #174 of 296
55%
Decided in 8 weeks
Below avg (63%) #209 of 296
40%
Extended time limit
Below avg (41%) #151 of 296
83%
Minor dwellings approved
279 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
46%
Change of use approved
28 decided
1,469
Total decisions
217 refused in the year to March 2026