Land at Towcester Vale Towcester Data via plota.co.uk

2025/1448/MAR - Reserved Matters Permission (Major) Approved

Proposal

Approval of reserved matters (access, appearance, landscaping, layout and scale) in respect of the main local centre comprising of a convenience store, 6 no. shop units, and 6 no. flats and 5 no. houses pursuant to outline application Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Mar 2025
✓
Validated
17 Apr 2025
✓
Approved
1 Oct 2025

Approved on 1 Oct 2025 · Committee · Last checked 24 Oct 2026

Documents 36

All documents on the council site ↗

Associated applications 17

Site constraints 3

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2; Priority habitat about 15 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Northamptonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Reserved Matters Permission (Major)
Received
27 Mar 2025
Validated
17 Apr 2025
Ward
Towcester Ward
Parish
Towcester
Target decision
3 Oct 2025
Decision
Approval
Decision date
1 Oct 2025
Decision level
Committee
Applicant
Show
Agent
Town Planning Services

How this decision compares

Decided in 167 days from validation, 8 days slower than West Northamptonshire's median of 159 for reserved matters. Approved, as 95% of reserved matters here are.

0%decided within 8 weeks
95%approved
48%go to committee

Plota live figures for reserved matters decided by West Northamptonshire in the last twelve months, from validation. West Northamptonshire decision record →

Consultation & key dates

Comments by
15 Aug 2025
Committee
30 Sept 2025
West Northamptonshire
Planning Authority Score
1.7/10
Poor
#280 of 296 councils
Relevant to this application:
Major dwellings

West Northamptonshire is one of the slowest councils in England for householder decisions, ranking #295 out of 296. The council extends the time limit on 79% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
West Northamptonshire decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #123 of 296
93%
Householder approved
Above avg (90%) #144 of 296
18%
Decided in 8 weeks
Below avg (63%) #295 of 296
79%
Extended time limit
Above avg (41%) #295 of 296
81%
Minor dwellings approved
170 decided (1-9 homes)
83%
Major dwellings approved
24 decided (10+ homes)
86%
Change of use approved
207 decided
1,832
Total decisions
179 refused in the year to March 2026