Replacement pedestrian bridge at Church Street, Rickmansworth

Summary of planning committee decision

Decided by Three Rivers Planning Committee on 18 Jun 2026.

25/1691/FULApproved

What was proposed

The proposal would replace the existing wooden bridge in the same location with a higher composite bridge using ramps instead of steps.

“Relevant planning history 1.1 None. Site description 2.1 The application site is located on the southern side of Riverside Drive, Rickmansworth. The site has an irregular shape and relates to the existing pedestrian access from Riverside Drive to the Glade Bridge. The existing bridge provides access over the Rivers Chess onto the towpath of the Grand Union canal.”

“It is also proposed to change the materials from a wooden structure to recycled plastics/composite structure. The bridge would have a maximum height of 2.3m above ground level. Three low quality trees are proposed for removal to facilitate the works. Amended plans were received during the course of the application to increase the base of the bridge and to include a mammal ledge. Consultation 4.1 Statutory Consultation…”

Officer report

Officers’ recommendation

Officers recommended approval because the bridge would not materially harm Green Belt openness, local character, neighbours, highways, biodiversity or flood risk, subject to conditions.

“Planning Analysis 7.1 Impact on Green Belt 7.1.1 The application site is located within the Metropolitan Green Belt. The fundamental aim of the Green Belt policy is to prevent urban sprawl by keeping land permanently open and the essential characteristics of Green Belts are their openness and their permanence. Paragraph 142 of the NPPF states that the Government attaches great importance to Green Belts.”

“Flood Risk 7.8.1 Policy DM8 of the DMP LDD sets out that development will only be permitted where it would not be subject to unacceptable risk of flooding; and would not unacceptably exacerbate risk of flooding elsewhere. Where practicable existing flood risks should be reduced. The application site is located in Flood Zone 3b (highest risk of flooding).”

Officer report

What members debated

Members focused on the bridge’s unclear colour and finish, the committee’s role in approving details, and whether works should avoid busier periods.

“Several Committee Members expressed concern about the absence of information relating to the colour and finish of the proposed new bridge, which was considered to be fundamental to the application. Whilst there was a condition requiring details and samples to be submitted and approved by the Local Planning Authority prior to the commencement of any building operations, the Planning Committee would have no role in deciding their appropriateness.”

“The Planning Officer responded that the attachment of a condition requiring details to be submitted to the Local Planning Authority was not unusual. Additionally, and for clarity, whilst the Council was the applicant it was the LPA which was the deciding authority, and the two were not the same. Should the Committee consider it appropriate, an informative could be added setting out any preference with regard to colour palettes, for example.”

Minutes

Vote and decision

Members approved the application with conditions and two additional informatives, by five votes to none, with three abstentions.

“Councillor Whately-Smith moved, and Councillor Smith seconded, that the application be approved subject to conditions and with additional informatives requesting (i) that the applicant should have regard to the comments of the Canal and River Trust in relation to the bridge’s appearance and (ii) that the applicant give consideration to the time of year during which works take place.”

“That the application be approved subject to conditions and with additional informatives requesting (i) that the applicant should have regard to the comments of the Canal and River Trust in relation to the bridge’s appearance and (ii) that the applicant give consideration to the time of year during which works take place.”

Minutes

Sources

  • Three Rivers Planning Committee minutes, 18 June 2026
  • Agenda and papers (council website)

Source: Plota analysis of Three Rivers's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Date
Thursday 18 June 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Vote
5 for, 0 against, 3 abstained
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

Source: Plota analysis of the minutes.

This committee's year

65 decisions in the 12 months to this meeting, 4 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →