42MW battery storage system at Land At Mid Ridd Glentaggart

Summary of planning committee decision

Decided by South Lanarkshire Planning Committee on 27 Jan 2026.

P/25/0685Approved

What was proposed

The application proposed a 42MW battery energy storage system with storage containers, control rooms, fencing, lighting, landscaping and supporting infrastructure.

“Description of Proposed Development 3.1 The application seeks detailed planning permission for a Battery Energy Storage System (BESS) with a capacity of 42MW. The main elements of the proposed development comprise the following:-”

“24 no. Battery Storage and Invertor Containers measuring 12m by 2.4m with a height of 3m • transformer measuring 2.8m by 3.2m with a height of 2.5m • Customer Control Room and Switch Room measuring 12.2m by 2.6m with a height of 3.6m • Distribution Network Operator (DNO) Control Room measuring 7.2m by 5.9m with a height of 3.6mm • 3.1m high security fence • Firewater Reserve Tank with a diameter of 9m and height of 3m • Security Cameras and Lighting • Landscaping…”

Officer report

The site

The 3.4-hectare site was rough grazing land near existing wind farms, accessed from the B7078 through the Mid Rigg wind farm track.

“Site Description 2.1 The application site extends to some 3.4ha in area and comprises an area of rough agricultural grazing land, with the area surrounding the site also comprising rough grazing land.”

“The site takes access off the existing access track which serves the Mid Rigg wind farm, which in turn takes access directly off the B7078.”

Officer report

What officers recommended

Officers recommended permission because the proposal complied with national and local policies and its effects could be acceptably managed.

“Assessment and Discussion 10.1 Introduction Under the terms of this application, full planning permission is sought for the development and operation of a battery energy storage system (BESS), with a capacity of 42MW on that land which comprises the application site. The key determining issues in the consideration of the application are its compliance with national policy, local development plan policy and its impact on the character and amenity of the surrounding area.”

“Conclusion In conclusion, it is considered that the proposed development complies with the relevant policies of both National Planning Framework 4 and the adopted South Lanarkshire Local Development Plan 2. It is recommended that planning permission be granted, subject to the conditions set out below and the conclusion of a legal agreement.”

Officer report

Consultation responses

Roads, environmental services and Historic Environment Scotland raised no objections, with roads and noise matters addressed through conditions.

“Consultations 6.1 Roads Development Management Team – No objection to the proposed development subject to conditions relating to the submission of a Construction Phase Traffic Management Plan, an Abnormal Load Route Assessment, a Bridge Assessment, and the conclusion of a section 96 agreement to cover unreasonable damage to the public road and bridges. Response: Noted.”

“Environmental Services – No objection to the proposed development subject to conditions relating to noise levels. Response: Noted. These matters could be addressed through conditions and on the decision notice if the application were to be approved.”

Officer report

Public representations

No representations were submitted following the application’s advertisement in the local press.

“Representations 7.1 Following the advertisement of the application in the local press no representations have been submitted in respect of the proposed development.”

Officer report

Committee discussion

The committee discussed the application, and an officer answered a member’s question about the report.

“There followed a discussion on the application during which an officer responded to a member’s question on an aspect of the report.”

Minutes

The committee’s decision

The committee granted planning permission subject to the conditions specified in the officer report.

“The Committee decided: that planning application P/25/0685 by Brockwell Energy Limited for the construction of a battery energy storage system with capacity of 42MW and associated supporting infrastructure at land at Mid Rig, Glentaggart be granted subject to the conditions specified in the Executive Director’s report.”

Minutes

Sources

  • South Lanarkshire Planning Committee minutes, 27 January 2026
  • Agenda and papers (council website)

Source: Plota analysis of South Lanarkshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Date
Tuesday 27 January 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

This committee's year

21 decisions in the 12 months to this meeting.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →