Hydroelectric energy scheme at B4595, Cardiff Road A4054, Treforest

Summary of planning committee decision

Decided by Rhondda Planning and Development Committee on 16 Apr 2026.

25/0003/LBCApproved

What was proposed

Listed Building Consent was sought for a hydroelectric scheme using the River Taff, including a turbine, channels, fish pass, substations, cable and access.

“Listed Building Consent (LBC) is sought for the installation of a hydroelectric renewable energy scheme and associated infrastructure at Treforest Weir, which is located in the River Taff between the A4054 (Cardiff Road) and the B4595 (Forest Road), just south of the Broadway and Glyntaff Interchange, in Treforest.”

“The hydroelectric ‘Kaplan’ turbine would be installed just to the south of the existing weir. It would be housed in a single turbine house which would be sunk into the bed of the river. It would measure 9.5m in width by 8m in depth with a flat ‘green’ roof construction that would measure 4.5m in height (2m above the existing feeder sluice wall). The turbine house would be stone faced using site reclaimed and/or matched material.”

Officer report

The site and heritage

The site contains a listed nineteenth-century weir and fish pass on the River Taff, with stonework, railings, river walls and later structures.

“The application site relates to an existing weir and fish pass located on the western bank of the River Taff in Treforest. Access to the site is currently via an unmade lane off Forest Road (B495) to the north.”

“Exterior The sluice is on the W side of the weir. It has coursed, rubble stone N wall formerly with 2 cast iron sluice gates on the upstream side, now with concrete cappings, metal railings and modern grilles at water level. On the opposite side of the wall is part of a cast iron lintel supported by 2 uprights, through which the water flowed. On the E side is a wall of coursed rubble with rock-faced quoins and dressings.”

Officer report

Earlier planning application

A separate planning application for the hydroelectric scheme and associated infrastructure was pending.

“The following planning applications are on record for this site:”

“25/0002/GREG: Hydroelectric renewable energy scheme and associated infrastructure works (Additional Information Rec. 15/01/25 & 21/02/25) (Amended Red Line Boundary Rec. 17/04/25) (Bat Emergence Report Rec. 05/08/25) (FCA and additional information rec. 05/11/25) Decision: Pending…”

Officer report

What officers recommended

Officers recommended approval because renewable energy benefits, reversible works and preservation of most of the original heritage asset mitigated heritage concerns.

“RECOMMENDATION: APPROVE, SUBJECT TO CONDITIONS AND FAVOURABLE REFERRAL TO CADW. REASONS:”

“While there are concerns regarding the direct impact of the works on the Heritage Asset, these are mitigated by the benefits of the renewable energy scheme, the reversibility of the works and the maintenance and preservation of the majority of the original Victorian Heritage Asset.”

Officer report

The main heritage issue

The works would affect historic fabric and change the asset’s setting, but the original structures would mostly remain and the scheme could be reversed.

“The LBC application is accompanied by a comprehensive Heritage Impact Statement (HIS) which assesses and evaluates the impact of the proposal on the Heritage Asset, its appearance, setting and how it would be perceived following the completion of the development. The proposal would have a direct impact on the special historical and architectural significance of the Heritage Asset.”

“Turning to the proposed development itself, there would be significant new structures that would essentially “wrap around” the existing, historic, sluice structures on site. The new development would be clearly discernible from the historic structures and due to their size, materials, scale and location they would alter the perception and setting of the Heritage Asset. However, modern additions often have this impact, by their very nature.”

Officer report

Consultation responses

Heneb raised no objection subject to conditions, while Historic Buildings and Places deferred to the council’s conservation officers.

“Historic Buildings and Places (HBP) – HBP have reviewed the application and do not wish make any comments on this occasion. We defer to the specialist advice of your Authority’s Conservation Officers to determine the application in accordance with local and national policy.”

“Heneb - No objection, subject to recommended conditions.”

Officer report

A neighbour’s objection

A neighbour objected that demolishing the adjacent business premises would threaten the owners’ livelihood and leave no suitable local vehicle-sales premises.

“The application has been advertised by means of direct neighbour notification letters and through the erection of site notices in the vicinity of the site. One letter of objection has been received the main point of which are detailed below:”

“The proposal includes the demolition of an adjacent business premises which would take away the owners’ livelihood should permission be granted. • This is having a detrimental effect on the business owners’ mental health. • Discussions with RCT’s Corporate Estates team are vague and no offer has yet been made. • The existing garage site is narrow and would be impossible to run should the business owner have to give up any part of the business.”

Officer report

The committee’s decision

The committee approved the application in accordance with the recommendation, subject to a favourable referral to Cadw.

“APPLICATION NO: 25/0003/LBC Hydroelectric renewable energy scheme and associated infrastructure works (Listed Building Consent) B4595, Cardiff Road A4054, Broadway and Glyntaff Interchange, Treforest, Rhondda Cynon Taf, Treforest, CF37 1SY”

“Following consideration, it was RESOLVED to approve application No. 25/0003 in accordance with the recommendation of the Director, Housing and Regeneration subject to a favourable referral to Cadw.”

Minutes

Sources

  • Rhondda Planning and Development Committee minutes, 16 April 2026
  • Agenda and papers (council website)

Source: Plota analysis of Rhondda's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Rhondda
Date
Thursday 16 April 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

This committee's year

72 decisions in the 12 months to this meeting, 3 against officer advice.

Source: Plota analysis of the committee's minutes.