Solar farm and battery storage at Land to the East of Scawby Road (B1206), Scawby Brook, Brigg
Summary of planning committee decision
Decided by North Lincs Planning Committee on 29 Jul 2026.
What was proposed
The application sought a 49.9MW solar array, battery storage, substation, access and related infrastructure, operating for 40 years.
“Planning Committee 29 July 2026 Proposal The planning application seeks consent for the construction and operation of a 49.9MW photovoltaic (PV) solar array, a 30MWh battery energy storage system (BESS), an on-site substation, associated access and infrastructure on land to the east of Scawby Road (B1206), Scawby Brook.”
“A number of other infrastructure components would be provided as part of the development, including a substation compound, a control room, welfare and storage compound, access tracks, security equipment and fencing, lighting, drainage, landscaping and underground cabling connecting the various PV parcels to the grid.”
Officer report
The site and its surroundings
The approximately 85-hectare site included arable fields, previously developed land, a railway, nearby renewable-energy facilities and areas in flood zones 2 and 3.
“Planning Committee 29 July 2026 PA/SCR/2022/10: EIA screening request for a <50MW solar array and associated infrastructure – opinion given 09/12/2022 BESS site (including wider site) The BESS site and wider site includes several permissions relating to the sugar beet factory, as well as the introduction of a hydrogen plant in 2024 within the power station site which sits adjacent to the site to the east.”
“To the east are further arable fields and the River Ancholme beyond. To the south lies further agricultural open land before the village of Hibaldstow. The proposed BESS area, the northernmost plot of land within the red line boundary, comprises previously developed land which is mostly hardstanding. Part of this plot is allocated for ‘Proposed Industry – BRIE-1’ and a ‘Landscape Proposal – LC15-9’ within the adopted development plan.”
Officer report
What officers recommended
Officers recommended approval because substantial renewable-energy benefits outweighed limited and temporary landscape harm, with technical impacts capable of mitigation through conditions.
“Planning Committee 29 July 2026 development in terms of character and appearance should only be afforded moderate weight in the planning balance. No other significant impacts are identified, with matters relating to ecology, highway safety, archaeology and construction all capable of being mitigated to low or negligible levels, through proposed conditions where necessary.”
“BNG has been demonstrated as capable of being provided above the statutory 10% requirement (currently shown as 86% for area habitats, 39% for hedgerows and 15% for watercourses). The most relevant policy in this case is DS21 which concerns renewable energy. Whilst there are identified conflicts with elements of other policies, the proposals should be considered in the context of the plan as a whole and other material considerations.”
Officer report
Who spoke at the meeting
An objector, the applicant and two local ward or council members addressed the committee about location, farmland, employment, traffic and renewable energy.
What members debated
Members debated whether the land was productive farmland, whether brownfield or rooftop alternatives existed, and whether the location was appropriate beside the highway.
“Councillor C Ross agreed with the objectors’ observations that the proposed site was good quality farmland, with a crop being grown at the site for the past 29 years. The crop was in fact being grown on the land at this exact moment. The claim that the land was unproductive was therefore inaccurate. The location of the site was also a concern, due to its proximity to the public highway.”
“Councillor C Sherwood was concerned that the proposed site was not appropriate for such a development, with there being many alternative sites/locations that the panels could be installed instead of a agricultural land.”
Minutes
The vote
A motion to refuse planning permission was proposed and seconded, and the motion was carried.
“That planning permission be refused for the following reasons –”
Minutes
The members' reasons
The resolution gives these reasons:
Minutes
- The applicant has failed to demonstrate, through a robust assessment of alternative sites, that the proposed solar farm could not be accommodated PLANNING COMMITTEE 29 July 2026 on more suitable previously developed land, brownfield land, industrial land or rooftop locations, as required by policy C of the North Lincolnshire 'Planning for Solar Photovoltaic (PV) Development' Supplementary Planning
Source: the council's minutes, quoted word for word.
Sources
- North Lincs Planning Committee minutes, 29 July 2026
- Agenda and papers (council website)
Source: Plota analysis of North Lincs's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- North Lincs Planning Committee
- Council
- North Lincs
- Date
- Wednesday 29 July 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Refused, against officer advice
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- North Lincs committee decisions →
This committee's year
122 decisions in the 12 months to this meeting, 14 against officer advice.
Source: Plota analysis of the committee's minutes.