Substation extension at Margam Substation, Margam

Summary of planning committee decision

Decided by Neath Planning Committee on 3 Mar 2026.

P2025/0817Approved

What was proposed

The application proposed extending the existing substation, adding a GIS Hall and new amenities building, with drainage, flood protection, access and ecological works.

“The application seeks full planning permission for the extension of the existing 275km substation, the erection of a Gas Insulated Switchgear Hall (GIS Hall) and the demolition of the existing control and amenities buildings to enable the erection of a new amenities building.”

Officer report

The site and its setting

The site is a 15.46-hectare low-lying wetland area beside the existing substation, railway, Tata Steelworks and other industrial facilities.

“The application site is located in Margam, Port Talbot and lies immediately northeast of the existing National Grid air insulated substation. The site is also located to the east of the main Swansea to London national railway line and Tata Steelworks, and to the south of the A4241 Harbour Way (PDR). The site measures approximately 15.46 hectares and is rectangular in shape and includes part of the private road off the A48 Margam Road that provides access for the site.”

“The site is relatively flat, low-lying wetland habitat and beyond this the surrounding area is characterised by industrial development, due to the proximity to Tata Steelworks and Western Wood Energy Plant and the British Oxygen Company Ltd (BOC) plant located to the east of the application site.”

Officer report

Why officers recommended approval

Officers considered the benefits of essential infrastructure and support for steelmaking outweighed ecological, drainage and flood-related harms, subject to mitigation and conditions.

“In conclusion, the development would result in ecological disturbance and affect the existing local drainage network on site, due to the loss of 1.67ha of SINC habitat, together with some limited implications for flood risk. These matters are material and require appropriate mitigation to ensure alignment with PPW12’s emphasis on climate resilience, biodiversity protection, and the sustainable use of natural resources.”

“Subject to the implementation of the proposed ecological enhancements, sustainable drainage solutions, flood-resilient design measures, and the delivery of an off-site net biodiversity benefit, the residual impacts are considered to be reduced to an acceptable level.”

Officer report

Who spoke at the meeting

The local ward member, Councillor Rob Jones, was present and made representations to the committee.

The committee’s decision

The committee approved the application in accordance with the officers’ recommendation, subject to the conditions in the report and amendment sheet.

“RESOLVED: That in accordance with Officers’ recommendations, Application No: P2025/0817 – Margam Sub Station Extension (as detailed in the circulated report) be Approved, subject to the conditions contained within the circulated report and amendment sheet.”

Minutes

Sources

  • Neath Planning Committee minutes, 3 March 2026
  • Agenda and papers (council website)

Source: Plota analysis of Neath's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.

Committee decisions and nationwide planning applications, in one API

The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.

See the API →

At the meeting

Council
Neath
Date
Tuesday 3 March 2026
Recommendation
Officers recommended approval
Committee decided
Approved
Minutes
The council's minutes
Meeting
Agenda and papers (council website)
Application
The application (council website)

This committee's year

5 decisions in the 12 months to this meeting, 1 against officer advice.

Source: Plota analysis of the committee's minutes.

Every decision by this council's committees →