Co-living and commercial building at 1-4 Beresford Square, Woolwich, London SE18
Summary of planning committee decision
Decided by Greenwich Planning Board on 24 Feb 2026.
What was proposed
The application proposed demolishing the existing building and replacing it with a part-five, part-six-storey mixed-use building containing 156 co-living rooms and commercial space.
“That full planning permission be granted for: Demolition of the existing building to facilitate a mixed-use redevelopment comprising a single, part 5, part 6-storey building with Co-Living Accommodation (Sui Generis) including ancillary facilities, and commercial floorspace (Use Class E), along with hard and soft landscaping, cycle parking, accessible car parking, refuse and recycling facilities, and other associated works.”
“This application seeks full planning permission for the comprehensive redevelopment of 1-4 Beresford Square, involving the demolition of the existing building to facilitate a mixed-use scheme. The proposal consists of a single building, ranging between five and six storeys in height, providing 156 Large-Scale Purpose-Built Shared Living (LSPBSL) rooms and 130.6 sqm of commercial floorspace.”
Officer report
The site and surroundings
The site is a prominent Woolwich town-centre corner with a low-rise commercial building, high public-transport accessibility and a sensitive heritage setting.
“The development site covers approximately 0.16 hectares and occupies a prominent corner within Woolwich Town Centre. It benefits from frontage onto Beresford Street to the north and Beresford Square to the east. The site currently accommodates a low-rise, three-storey building with an open paved area to the rear. The ground floor retail units house commercial tenants, while the upper office levels have been vacant since 2013.”
“Transport Context 5.6 The site benefits from exceptionally high public transport accessibility, evidenced by PTAL ratings of 6a and 6b (the highest achievable). This reflects excellent access to frequent public transport services through its close proximity to: • Woolwich Station (Elizabeth Line): Approximately 120m from the site. • Woolwich Arsenal DLR Station: Approximately 40m from the site.”
Officer report
Earlier applications
Earlier permissions covered a hair and beauty spa, adult learning, signs and a temporary electricity transformer kiosk at or near the site.
“Application Reference Location Proposal Description Status 15/2038/F 4 Beresford Square Change of use to a hair and beauty spa. Approved 12/2178/F 1-4 Beresford Street Temporary change of use of the second floor from B1 (Office) to D1 (Adult Learning Unit). Approved 94/1565/A 1-4 Beresford Square Erection of two 20' x 3' banners. Approved 94/0102/A 1-4 Beresford Square Erection of two 8' x 6' single signboards.”
Officer report
Why officers supported it
Officers considered that housing, town-centre regeneration, employment, sustainability and affordable-housing payments outweighed limited heritage harm and other impacts.
“The scheme follows the Viability Tested Route in accordance with London Plan Policy H16. While an independent viability review confirmed the development is currently in deficit and technically supports a “nil” contribution, the applicant has committed to a total financial package of £2,289,415 toward off-site affordable housing. This package comprising a £1,724,415 PiL and a £565,000 Accelerated LSR payment, is equivalent to 15.23% affordable housing.”
“In balancing heritage impacts, the assessment confirms the development results in a very low level of “less than substantial harm” to the setting of designated heritage assets, including the Grade I listed Royal Brass Foundry. In accordance with the NPPF and the Planning (Listed Buildings and Conservation Areas) Act 1990, “great weight” has been given to the conservation of these assets.”
Officer report
Residents’ views
One response supported redevelopment, housing, density and economic benefits, while another questioned co-living, construction disruption and commercial provision.
“ITEM NO: PAGE NO: 31 assessed in detail within Section 16.0 ‘Affordable Housing’. Economic Benefits Anticipated increase in footfall and local spending, welcoming the contribution new residents will make to the local economy. The economic and social benefits of the scheme are assessed in Section 21.0 ‘Socio-economics’ of this report.”
“Construction impacts, including potential noise, air quality, and access disruption, are managed via detailed planning conditions requiring the submission of a Construction Logistics Plan (CLP) and Construction Environmental Management Plan (CEMP). These are discussed in Section 20.0 ‘Transport and Access. Commercial Provision Retention of commercial floor space is generally supported, but questions are raised over the level of oversupply in the town centre.”
Officer report
Who spoke
The Principal Planner explained the scheme, and the developer’s representatives described its management, accommodation, demand, affordability and regeneration benefits.
What members discussed
Members discussed the effect of single-occupancy schemes, town-centre regeneration, housing choice, social interaction, heritage changes, local businesses and the developer’s management role.
“In response to Members questions the developers advised as part of the housing needs study that informed the proposal the local housing demand was considers local demand, which was typically younger professionals transitioning from nearby student accommodation and seeking quality homes with employment access, including London links.”
“Another Member welcomed the proposal, expressing hope that it would contribute positively to the regeneration of Woolwich and bring a fresh perspective to Beresford Square. They felt it would support local businesses and bring diversity to the area, particularly welcoming and active the street frontage and the roof gardens.”
Minutes
The vote
Seven members voted for approval, with none against and none abstaining.
“The Chair put the recommendation to grant planning consent to the vote with 7 Members in favour 0 Members against 0 Members abstaining…”
Minutes
The decision
The Planning Board granted permission for the mixed-use redevelopment, subject to conditions and prior completion of the Section 106 agreement.
“(ii) The prior completion of an agreement under Section 106 of the Town and Country Planning Act 1990, containing the planning obligations summarised in the heads of terms as set out in the report (Section 28.0).”
“(ii) Finalise the detailed terms of the section 106 agreement and form of the planning obligations as set out in this report (Section 28.0), its addendums and the minutes of this Planning Board meeting.”
Minutes
What must happen first
The permission included detailed conditions, Section 106 obligations and authority to finalise wording before the decision notice was issued.
“That the Assistant Director (Planning & Building Control) be authorised to: (i) Make any minor changes to the detailed wording of the recommended conditions as set out in Appendix 2 of the report, its addendums and the minutes of this Planning Board meeting, where the Assistant Director (Planning & Building Control) considers it appropriate, before issuing the final decision notice.”
Minutes
The members' reasons
“Moving to deliberation a Member noted they felt reassured by the applicant’s presentation.”
“A Member considered that the proposal would positively add to the social mix of the town centre.”
Minutes
Source: the council's minutes, quoted word for word.
Sources
- Greenwich Planning Board minutes, 24 February 2026
- Agenda and papers (council website)
Source: Plota analysis of Greenwich's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Greenwich Planning Board
- Council
- Greenwich
- Date
- Tuesday 24 February 2026
- Recommendation
- Officers recommended approval
- Committee decided
- Approved
- Vote
- Unanimous
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- The application (council website)
- All decisions
- Greenwich committee decisions →
This committee's year
9 decisions in the 12 months to this meeting, 1 against officer advice.
Source: Plota analysis of the committee's minutes.