Solar and renewables in Southend

Southend received 25 renewable energy applications in the last 12 months, including 7 heat pumps. Of the 18 decided so far, 15 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Southend

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
2 days ago Registered 26/01381/FULH

4 Sea Reach Leigh-on-sea Essex SS9 1BL

Erect single storey porch extension, relocate main entrance, modification and replacement of external fenestration and cladding and installation of in...

Full Application - Householder Southend
7 Oct 2026 Registered 26/01309/FULH

33 Lansdowne Avenue Leigh-on-sea Essex SS9 1LJ

Raise ridge to form habitable accommodation in loftspace with dormer to rear and rooflights to front, install solar PV panels to roof, demolish conser...

Full Application - Householder Southend
5 Oct 2026 Registered 26/01286/FUL

116 - 122 London Road Southend-on-sea Essex SS1 1PQ

Change of use to first floor from offices (Class E) to 7-bed HMO (Sui-Generis), install roof terrace, solar PV panels, alter fenestration, alter east ...

Full Application Southend
28 Sept 2026 Registered 26/01275/CLP

33 Lansdowne Avenue Leigh-on-sea Essex SS9 1LJ

Demolish conservatory, single storey rear extension, alter elevations, remove rear chimney stack, install detached outbuilding and heat pump to rear g...

Certificate of Lawfulness (Proposed) Southend
18 Sept 2026 Registered 26/01233/FULH

6 Trinity Avenue Westcliff-on-sea Essex SS0 7PU

Install dormer to rear and solar panels to rear roof slopes

Full Application - Householder Southend
16 Sept 2026 Registered 26/01219/PA52

Post Office Short Street Southend-on-sea Essex SS2 5BY

Install 1422no. monocrystalline silicon solar photo-voltaic modules over pitched roof (Prior Approval)

PriorNot-RoofSolaronNonDomestic Southend
9 Sept 2026 Registered 26/01194/FULH

42 Parkanaur Avenue Thorpe Bay Essex SS1 3HY

Demolish first floor rear extension, raise ridge height and alter roof pitch, install dormer to rear with Juliet balconies to form habitable accommoda...

Full Application - Householder Southend
7 Aug 2026 Refused 29 Sep 26/01005/FUL

232 Southbourne Grove Westcliff-on-sea Essex

Erect carport and install 26 solar panels to roof (Part Retrospective)

Full Application Southend
5 Aug 2026 Approved 30 Sep 26/01014/FUL

144 Station Road Westcliff-on-sea Essex SS0 7SB

Change of use of ground floor from shop (Class E) to dwelling (Class C3) alter front and rear elevations, layout amenity area to rear with bin and cyc...

Full Application Southend
30 Jul 2026 Approved 21 Sep 26/00979/FUL

28 Benvenue Avenue Eastwood Essex SS9 5SJ

Erect single storey detached annex to rear of main dwellinghouse with roof lantern and solar panels

Full Application Southend
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Southend

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Southend?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Southend. You can also narrow the alert to a postcode, street, or drawn area.

We check Southend's planning portal daily. New solar & renewables applications appear here within a day of being published.