Solar and renewables in Causeway and Glens

Causeway and Glens received 31 renewable energy applications in the last 12 months, including 6 battery storage sites and 3 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 11 of 11 applications
20 Oct 2026 Valid LA01/2026/1145/F

82 Coleraine Road, Portrush

Renovation and extension of existing dwelling, including; new bay window to ground floor front elevation, single storey extension to garage at front e...

Full Causeway And Glens
9 Oct 2026 Decided 13 Oct LA01/2026/1105/PAN

Approx. 125m South West of 289A Finvoy Road, Rasharkin

Proposed battery energy storage system (BESS), substation compound and single storey control building, underground grid connection, access lane; lands...

Proposal of Application Notice Causeway And Glens
7 Oct 2026 Valid LA01/2026/1076/F

495m South of 40 Glen Road, Garvagh, Coleraine

Erection of turbine - Proposed substitute of previously approved turbine under C/2010/0419/F. Hub height increase from 31.5m to 40m. Blade diameter ...

Full Causeway And Glens
6 Oct 2026 Valid LA01/2026/1088/F

Lands approximately 455m northeast of No. 59 Craigmore Road (BT51 5HF) and 276m northwest of No. 51 Craigmore…

Proposed extension to the approved Cam Burn Wind Farm (C/2011/0459/F and LA01/2022/1209/F) comprising 3no. turbines (tip height up to 150m), crane pad...

Full Causeway And Glens
6 Oct 2026 Consultation Open LA01/2026/0988/F

Ringhaddy House, 1-16 Eglinton Court, Eglington Street, Portrush

Proposed disabled entrance door and associated disabled access ramp (to unit No 1) and the provision of solar panels on the front and rear elevations ...

Full Causeway And Glens
8 Sept 2026 Consultation Open LA01/2026/0924/F

Lands within Corkey Wind Farm, located South of Reservoir Road and East of Corkey Road, Corkey, approximately…

Proposed temporary construction compound within operational Corkey Windfarm, Co. Antrim.

Full Causeway And Glens
2 Sept 2026 Under Consideration LA01/2026/0910/F

Lands adjoining and NW of Acorn Centre & adjoining & to the rear of 45-49 Chesnut Grove, Ballymoney

Erection of manufacturing facility/workshop including storage, distribution, offices, parking, landscaping and rooftop solar panels on industrial zone...

Full Causeway And Glens
2 Sept 2026 Consultation Open LA01/2026/0866/F

500m North West of 60 Loguestown Road, Portrush

Proposed Replacement Of Existing Single Wind Turbine (Ref:- LA01/2018/0207/F) With 250KW Turbine With 35M Hub Height

Full Causeway And Glens
1 Sept 2026 Consultation Open LA01/2026/0906/F

16 Formoyle Road, Macosquin, Formoyle, Coleraine

Retrospective planning application for erection of solar panels and air source heat pump on listed building.

Full Causeway And Glens
25 Aug 2026 Decided 22 Sep LA01/2026/0903/PAN

Approx. 125m South West of 289a Finvoy Road, Rasharkin

Proposed battery energy storage system (BESS), substation compound and single storey control building, underground grid connection, access lane; lands...

Proposal of Application Notice Causeway And Glens
17 Aug 2026 Site Inspection Complete LA01/2026/0850/F

2b Circular Road, Castlerock

Proposed wall mounted Heat Pump

Full Causeway And Glens
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Causeway and Glens

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Causeway and Glens?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Causeway and Glens. You can also narrow the alert to a postcode, street, or drawn area.

We check Causeway and Glens's planning portal daily. New solar & renewables applications appear here within a day of being published.