The Factory 64 72 Roe Road Northampton NN1 4PJ Data via plota.co.uk

Pending 2026/4243/COND
Date received
12 Oct 2026
Date validated
12 Oct 2026
Postcode
NN1 4PJ

Description

Discharge of Condition 17 [Windows] of Planning Permission 2026/0556/S73 [Variation of Condition 2 (approved plans) of planning permission to substitute the approved drawings with as-built drawings to reflect the development as constructed, including the retention of part of the northern elevation, minor alterations to window openings, and associated internal and external amendments of planning permission (Conversion of existing factory building (Use Class B2) to 19 no self-contained flats for supported living (Use Class C2) and associated works including external alterations, formation of new vehicular access, creation of under croft parking, stopping up existing access, creation of amenity space and partial demolition)] Data via plota.co.uk

Last checked

Site constraints 2

Also on the record
Radon affected area, class 4; Inside the Northampton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 27 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Northamptonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
West Northamptonshire
Planning Authority Score
1.7/10
Poor
#280 of 296 councils
Relevant to this application:
Householder decisions

West Northamptonshire is one of the slowest councils in England for householder decisions, ranking #295 out of 296. The council extends the time limit on 79% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
West Northamptonshire decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #123 of 296
93%
Householder approved
Above avg (90%) #144 of 296
18%
Decided in 8 weeks
Below avg (63%) #295 of 296
79%
Extended time limit
Above avg (41%) #295 of 296
81%
Minor dwellings approved
170 decided (1-9 homes)
83%
Major dwellings approved
24 decided (10+ homes)
86%
Change of use approved
207 decided
1,832
Total decisions
179 refused in the year to March 2026