P/2026/00992 - Screening Opinion Live

Proposal

EIA Screening Opinion Request on behalf of Severn Trent Water Limited (STWL) for the Proposed Installation of an Approximately 34km Underground Water Transfer Pipeline Between Carsington Reservoir and Tittesworth Water Treatment Works, Together with an Associated Pumping Station, Break Pressure Tank and Water Treatment Infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
Decision
Expected by 17 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Nov 2026 and 8 Dec 2026, from East Staffordshire's recent utility and infrastructure works.

Site constraints 4

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; National infrastructure project 365 m away: Peak Cluster CCS Pipeline, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,854 m² (30,720 sq ft)
Energy ratingD (asset rating 97)
UseB1 Offices and Workshop businesses
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in February 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Staffordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Screening Opinion
Received
22 Sept 2026
Validated
22 Sept 2026
Ward
Stramshall & Weaver
Parish
Wootton CP
Case officer
Show
Decision level
Delegated
Applicant
Show

Decision outlook

Day 17 of the 56-day target. East Staffordshire usually decides utility and infrastructure works by day 66.

Day 1749 days to the predicted decision (day 66)
41%decided within 8 weeks
89%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by East Staffordshire in the last twelve months, from validation. East Staffordshire decision record →

Consultation & key dates

Alt. reference
EC/2026/01003
Committee
23 Sept 2026
Env. assessment
No
East Staffordshire
Planning Authority Score
2.6/10
Poor
#246 of 296 councils
Relevant to this application:
Householder decisions

East Staffordshire is one of the slowest councils in England for householder decisions, ranking #294 out of 296. The council extends the time limit on 70% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Staffordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #53 of 296
95%
Householder approved
Above avg (90%) #75 of 296
21%
Decided in 8 weeks
Below avg (63%) #294 of 296
70%
Extended time limit
Above avg (41%) #285 of 296
84%
Minor dwellings approved
57 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
80%
Change of use approved
50 decided
601
Total decisions
45 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.