Jaguar Land Rover Wolverhampton Unit B Innovation Drive Pendeford WOLVERHAMPTON WV9 5GA Data via plota.co.uk

25/00511/FULM - Major Full Application Approved

Proposal

Erection of 1no. building to enclose recycling operations (Use Class B2) together with other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2025
✓
Consultation
28 Aug 2025
✓
Approved
11 Sept 2025

Approved on 11 Sept 2025 · Delegated Decision · Last checked 18 Oct 2026

Documents 33

Statements & assessments 18

PDF EMCWYB-RDG-XX-XX-RP-C-0002_FRA DRAINAGE REPORT PART 1 Flood Risk Assessment · 28 Aug 2025 View ↗ PDF EMCWYB-RDG-XX-XX-RP-C-0002_FRA DRAINAGE REPORT PART 2 Flood Risk Assessment · 28 Aug 2025 View ↗ PDF EMCWYB-RDG-XX-XX-RP-C-0002_FRA DRAINAGE REPORT PART 3 Flood Risk Assessment · 28 Aug 2025 View ↗ PDF EMCWYB-RDG-XX-XX-RP-C-0002_FRA DRAINAGE REPORT PART 4 Flood Risk Assessment · 28 Aug 2025 View ↗ PDF LIGHTING ASSESSMENT Documents · 16 Jul 2025 View ↗ PDF EMCWYB-RDG-XX-XX-T-A-300004 WASTE YARD AND BALER - DESIGN AND ACCESS STATEMENT Documents · 17 Jun 2025 View ↗ PDF EMCWYB-RDG-XX-XX-T-A-300004 WASTE YARD AND BALER - DESIGN AND ACCESS STATEMENT Documents · 17 Jun 2025 View ↗ PDF EMCWYB-RDG-XX-XX-T-A-300004 WASTE YARD AND BALER - DESIGN AND ACCESS STATEMENT Documents · 17 Jun 2025 View ↗ PDF 5027781-RDG-XX-ST-DOC-C-00GCA01 GROUND CONTAMINATION ASSESSMENT Documents · 17 Jun 2025 View ↗ PDF 425.066713.00002 NOISE REPORT FINAL_WDRAWINGS Documents · 17 Jun 2025 View ↗ PDF EMCWYB-RDG-XX-XX-RP-C-0002 DRAINAGE STRATEGY REPORT REV P02 PART 1 Documents · 17 Jun 2025 View ↗ PDF EMCWYB-RDG-XX-XX-RP-C-0002 DRAINAGE STRATEGY REPORT REV P02 PART 2 Documents · 17 Jun 2025 View ↗ PDF 425.066713.00001 LIGHTING BASELINE SURVEY REPORT FINAL 04.06.25 PART 1 Documents · 17 Jun 2025 View ↗ PDF LIGHTING BASELINE SURVEY REPORT FINAL 04.06.25 PART 2 Documents · 17 Jun 2025 View ↗ PDF 5027781-RDG-XX-ST-DOC-C-00DTS01 PRELIMINARY RISK ASSESSMENT PART 2 Documents · 17 Jun 2025 View ↗ PDF 5027781-RDG-XX-ST-DOC-C-00DTS01 PRELIMINARY RISK ASSESSMENT PART 3 Documents · 17 Jun 2025 View ↗ PDF 5027781-RDG-XX-ST-DOC-C-00DTS01 PRELIMINARY RISK ASSESSMENT PART 1 Documents · 17 Jun 2025 View ↗ PDF PLANNING STATEMENT FINAL Documents · 17 Jun 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 4

National infrastructure project 450 m away: M54 to M6 Link Road
The site is 450 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Wolverhampton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Staffordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Major Full Application
Postcode
WV9 5GA
Received
17 Jun 2025
Validated
17 Jun 2025
Ward
Bilbrook
Parish
BILBROOK
Case officer
Show
Target decision
16 Sept 2025
Decision
APPROVED Subject to Conditions
Decision date
11 Sept 2025
Decision level
Delegated Decision
Applicant
Show
Agent
WSP

How this decision compares

Decided in 86 days from validation, 4 days slower than South Staffordshire's median of 82 for full applications. Approved, as 69% of full applications here are.

32%decided within 8 weeks
69%approved
10%go to committee

Plota live figures for full applications decided by South Staffordshire in the last twelve months, from validation. South Staffordshire decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14048308
Planning Portal ref
PP-14048308
Neighbours
1 Jul 2025
Consultation
28 Aug 2025
Comments by
11 Sept 2025
Site or press notice
11 Jul 2025
Statutory expiry
16 Sept 2025
Env. assessment
No
South Staffordshire
Planning Authority Score
3.5/10
Below average
#220 of 296 councils
Relevant to this application:
Major dwellings

South Staffordshire ranks #179 out of 296 councils for householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Staffordshire decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #211 of 296
91%
Householder approved
Above avg (90%) #180 of 296
61%
Decided in 8 weeks
Below avg (63%) #179 of 296
49%
Extended time limit
Above avg (41%) #222 of 296
71%
Minor dwellings approved
75 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
87%
Change of use approved
23 decided
612
Total decisions
89 refused in the year to March 2026