Shortmead Garages Shortmead Drive Cheshunt EN8 8TX Data via plota.co.uk

07/26/0619/F - Full REGISTERED: Under Assessment

Proposal

Erection of two storey residential apartment building comprising 6 flats including 2 no. 1 bedroom flats and 4 no. 2 bedroom flats with associated parking, secure bicycle store, landscaping, amenity space and separate refuse store following demolition of existing garages Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2026
Decision
Expected by 1 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 64.

The consultation period closed on 11 Sept 2026.

Documents 44

Consultation & comments 13

PDF Objector’s name hidden Show Consultee Response - Objection · 1 Sept 2026 View ↗
PDF Objector’s name hidden Show Consultee Response - Objection · 1 Sept 2026 View ↗
PDF Objector’s name hidden Show Consultee Response - Objection · 1 Sept 2026 View ↗
PDF HCC Highways Statutory Response · 26 Aug 2026 View ↗
PDF Objector’s name hidden Show Consultee Response - Objection · 26 Aug 2026 View ↗
PDF Objector’s name hidden Show Consultee Response - Objection · 26 Aug 2026 View ↗
PDF Objector’s name hidden Show Consultee Response - Objection · 26 Aug 2026 View ↗
PDF D Cornish Consultee Response - Non-Committal · 25 Aug 2026 View ↗ PDF Tree Works Officer Statutory Response · 25 Aug 2026 View ↗
PDF Name hidden Show Consultee Response - Non-Committal · 25 Aug 2026 View ↗
PDF Environment Agency Statutory Response · 24 Aug 2026 View ↗ PDF G Knight Consultee Response - Non-Committal · 20 Aug 2026 View ↗ PDF Environmental Health Statutory Response · 20 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Special protection area 226 m away: Lee Valley
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 887 m away: North London (Electricity Line) Reinforcement
The site is 887 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI 226 m away: Turnford & Cheshunt Pits SSSI; Inside the Cheshunt built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Broxbourne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Broxbourne
Application type
Full
Postcode
EN8 8TX
Received
6 Aug 2026
Validated
6 Aug 2026
Ward
Cheshunt South and Theobalds
Case officer
Show

Decision outlook

Day 64, past the statutory target. 92% of demolitions in Broxbourne are decided within thirteen weeks, which runs to 5 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 648 days past the 56-day target
52%decided within 8 weeks
85%approved
31decided in the last year

Plota live figures for demolitions decided by Broxbourne in the last twelve months, from validation. Broxbourne decision record →

Consultation & key dates

Consultation
10 Aug 2026
Comments by
11 Sept 2026
Statutory expiry
1 Oct 2026
Broxbourne
Planning Authority Score
3.8/10
Below average
#205 of 296 councils
Relevant to this application:
Householder decisions

Broxbourne is slower than most councils at deciding householder applications, ranking #218 out of 296. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Broxbourne decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #204 of 296
93%
Householder approved
Above avg (90%) #125 of 296
53%
Decided in 8 weeks
Below avg (63%) #218 of 296
48%
Extended time limit
Above avg (41%) #211 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
65%
Change of use approved
26 decided
481
Total decisions
70 refused in the year to March 2026