Land At The Street Martlesham Suffolk Data via plota.co.uk

DC/25/3186/FUL - Full Application Approved

Proposal

Change of use of land to a dog exercising field Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Aug 2025
✓
Validated
12 Sept 2025
✗
Appeal dismissed
3 Oct 2025
✓
Approved
12 Nov 2025

Approved on 12 Nov 2025 · Delegated Decision · Last checked 27 Oct 2026

Documents 22

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 262 m away: East Anglia THREE Offshore Wind Farm
The site is about 262 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National landscape about 7 m away: Suffolk Coast & Heaths
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Also on the record
2 listed buildings within 150 m of the postcode pin; Priority habitat about 9 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 12 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
15 Aug 2025
Validated
12 Sept 2025
Ward
Martlesham And Purdis Farm
Parish
Martlesham
Target decision
7 Nov 2025
Decision
Application Permitted
Decision date
12 Nov 2025
Decision level
Delegated Decision
Appeal
Dismissed · 3 Oct 2025 · Written Representations · Inspectorate case 3370228 ↗
Applicant
Show
Agent
Acorus Rural Property Services

How this decision compares

Decided in 61 days from validation, 5 days slower than East Suffolk's median of 56 for full applications. Approved, as 93% of full applications here are.

52%decided within 8 weeks
93%approved
1,256decided in the last year

Plota live figures for full applications decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Public comments

No public comments yet.

11 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
7 Nov 2025
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Change of use

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026